Classification No. 249024
IMO No. 1014955
Official No. 23731 
Signal Letters 5LPD3 
Flag Liberia 
Port of Registry Monrovia 
Ship's Name TAI HONOR 
Former Name 1 --
 
Registered Owner 1 TAI SHING MARITIME CO., S.A.
 
Management Company 1 TAIWAN NAVIGATION CO., LTD.
 
Classification Characters, Notations NS(BCM, BC-XII, GRAB, PSPC-WBT, NC)(IWS)(IHM)(EEDI-p3)(NOx-III(SCR, EGR))
MNS 
Descriptive Notes 
Design Condition Double hull construction applied to all cargo holds
Other NOx-III(2021)(M/E : EGR), (G/E(Nos.1, 2, 3) : SCR)
Installation Characters CHG, MPP, LSA, RCF, AFS, BWM 
Installation Descriptive Notes 
Special Description -- 
Other Classification -- 
 
Type of Ship -Purpose(intended service) BULK CARRIER 
- Certificates - SC/SE/SF Bulk carrier (SOLAS XII Reg. 1.1)
- OPP Other than Oil Tanker
- EE Bulk carrier
- SMC/ISSC Other cargo ship
 
Tonnage Gross (Registered) 24,458 
Tonnage Net (Registered) 13,025 
Tonnage Gross (Local) -- 
Tonnage Net (Local) -- 
Tonnage Gross (TM69) 24,458 
Tonnage Net (TM69) 13,025 
Deadweight 39,949 
 
Summer Freeboard (mm) 4,453 
Summer Draught (m) 10.392 
Lf (m) 179.900 
Continuous Max. Speed (kt)  sp;
(Sea Trial) :
-- 
Equipment No. 2,625 
 
Overall Length (m) 182.940 
Moulded LxBxD (m) 179.900 x 31.600 x 14.800 
Registered LxBxD (m) 179.900 x 31.600 x 14.800 
 
Cargo Capacity  
(m3 / No. of Containers, etc.)
B 49,146.90 G 50,508.90 
No. of Passengers -- 
Capacity of Tanks (m3) FO 1,831.00 FW 286.60 
 
No. & Kind of Engines 1DE : 2 SA 6 CY 
Bore x Stroke (mm) 420.0 x 1,930.0 
Power (kW) 5,050 
Revolution (rpm) 101.0 
Manufacturer Japan Engine Corporation 
 
No. & Kind of Boilers 1 AUX VB 
Pressure (MPa) 0.69 
Evaporation 2.16 (ton/h) 
Manufacturer OSAKA BOILER MFG. CO., LTD. 
*Evaporation rate: Thermal output (kW) to be filled up in case of TOH.
 
No. & Capacity of Generators (kVA) 4 AC 2,180 
Kind of Propeller Shaft 1B 
Fixed Method of Propeller Keyless 
No. & Shaft Diameter (mm) 1 x 450 
 
Shipbuilder NAMURA SHIPBUILDING CO., LTD. IMARI SHIPYARD & WORKS 
Hull No. 509 
Date of Keel Lay 27 Dec 2023 
Date of Launch 24 May 2024 
Date of Build 06 Aug 2024 
Date of Conversion --