Classification No. 252277
IMO No. 1016185
Official No. 23428 
Signal Letters 5LNR4 
Flag Liberia 
Port of Registry Monrovia 
Ship's Name SELANGOR PARK 
Former Name 1 --
 
Registered Owner 1 PICER MARINE, S.A.
 
Management Company 1 ZODIAC MARITIME LIMITED
 
Classification Characters, Notations NS*(TOB/CT II&III, PSPC-WBT, NC)(ESP)(IWS)(PSCM)(EEDI-p3)(NOx-III(SCR))
MNS* 
Descriptive Notes 
Other NOx-III(M/E : SCR), (G/E(Nos.1, 2, 3) : SCR)
Installation Characters CHG, MPP, LSA, RCF, M0, AFS, BWM, IHM 
Installation Descriptive Notes 
Automatic and Remote Control Systems The ship has complied with the requirements of Chapter II-1, Part E of SOLAS, "Periodically unattended machinery spaces (UMS)".
Special Description -- 
Other Classification -- 
 
Type of Ship -Purpose(intended service) OIL/CHEMICAL CARRIER 
- Certificates - SC/SE/SF Oil tanker / Chemical tanker
- OPP Oil tanker
- EE Tanker
- SMC/ISSC --
 
Tonnage Gross (Registered) 12,221 
Tonnage Net (Registered) 6,260 
Tonnage Gross (Local) -- 
Tonnage Net (Local) -- 
Tonnage Gross (TM69) 12,221 
Tonnage Net (TM69) 6,260 
Deadweight 19,988.7 
 
Summer Freeboard (mm) 3,424 
Summer Draught (m) 9.712 
Lf (m) 138.440 
Continuous Max. Speed (kt)  sp;
(Sea Trial) :
-- 
Equipment No. 1,884 
 
Overall Length (m) 146.500 
Moulded LxBxD (m) 138.000 x 24.000 x 13.100 
Registered LxBxD (m) 138.440 x 24.000 x 13.100 
 
Cargo Capacity  
(m3 / No. of Containers, etc.)
L 22,311.20 
No. of Passengers -- 
Capacity of Tanks (m3) FO 1,024.63 FW 294.33 
 
No. & Kind of Engines 1DE : 2 SA 6 CY 
Bore x Stroke (mm) 400.0 x 1,770.0 
Power (kW) 4,330 
Revolution (rpm) 115.0 
Manufacturer MAKITA CORPORATION 
 
No. & Kind of Boilers 1 AUX VB 
Pressure (MPa) 0.98 
Evaporation 15.66 (ton/h) 
Manufacturer MIURA CO., LTD. 
*Evaporation rate: Thermal output (kW) to be filled up in case of TOH.
 
No. & Capacity of Generators (kVA) 4 AC 3,175 
Kind of Propeller Shaft 1B 
Fixed Method of Propeller Keyless 
No. & Shaft Diameter (mm) 1 x 405 
 
Shipbuilder FUKUOKA SHIPBUILDING CO., LTD. 
Hull No. F-1357 
Date of Keel Lay 18 Dec 2024 
Date of Launch 18 Mar 2025 
Date of Build 11 Jul 2025 
Date of Conversion --