Classification No. 252813
IMO No. 1046051
Official No. 144854 
Signal Letters 7KRP 
Flag Japan 
Port of Registry Kobe 
Ship's Name TETHYS HIGHWAY 
Former Name 1 --
 
Registered Owner 1 Kaisho Shipping Co., Ltd.
 
Management Company 1 "K" Line RoRo Bulk Ship Management Co., Ltd.
 
Classification Characters, Notations NS*(VC, EQ C DG, EQ C CHPMV, PSPC-WBT, NC, GLF/NG, 1C)(IWS)(PSCM)(EEDI-p3)(NOx-III(DFE))
MNS* 
Descriptive Notes 
Other NOx-III(M/E : DFE), (G/E(Nos.1, 2, 3) : DFE)
Installation Characters CHG, MPP, LSA, CAA, RCF, M0, AFS, BWM, IHM 
Installation Descriptive Notes 
Special Description -- 
Other Classification -- 
 
Type of Ship -Purpose(intended service) VEHICLES CARRIER 
- Certificates - SC/SE/SF Other cargo ship
- OPP Other than Oil Tanker
- EE Ro-ro cargo ship (Vehicle carrier)
- SMC/ISSC Other cargo ship
 
Tonnage Gross (Registered) 45,667 
Tonnage Net (Registered) -- 
Tonnage Gross (Local) 45,667 
Tonnage Net (Local) -- 
Tonnage Gross (TM69) 75,259 
Tonnage Net (TM69) 22,577 
Deadweight 19,753 
 
Summer Freeboard (mm) 4,565 
Summer Draught (m) 10.075 
Lf (m) 196.000 
Continuous Max. Speed (kt)  sp;
(Sea Trial) :
-- 
Equipment No. 4,330 
 
Overall Length (m) 199.960 
Moulded LxBxD (m) 196.000 x 38.000 x 14.600 
Registered LxBxD (m) 196.000 x 38.000 x 21.870 
 
Cargo Capacity  
(m3 / No. of Containers, etc.)
CAR x 6,977 
No. of Passengers -- 
Capacity of Tanks (m3) FO 1,529.54 FW 426.64 
 
No. & Kind of Engines 1DF : 2 SA 8 CY 
Bore x Stroke (mm) 520.0 x 2,315.0 
Power (kW) 11,920 
Revolution (rpm) 105.0 
Manufacturer Mitsui E&S DU Co., Ltd. 
 
No. & Kind of Boilers 1 AUX VB 
Pressure (MPa) 0.69 
Evaporation 3.59 (ton/h) 
Manufacturer TORTOISE ENGINEERING CO., LTD. 
*Evaporation rate: Thermal output (kW) to be filled up in case of TOH.
 
No. & Capacity of Generators (kVA) 4 AC 4,825 
Kind of Propeller Shaft 1C 
Fixed Method of Propeller Keyless 
No. & Shaft Diameter (mm) 1 x 610 
 
Shipbuilder SHIN KURUSHIMA TOYOHASHI SHIPBUILDING CO., LTD. 
Hull No. 3765 
Date of Keel Lay 26 Feb 2024 
Date of Launch 29 Nov 2024 
Date of Build 15 Jul 2025 
Date of Conversion --