REMARK


This ship’s class registration is still waiting to be officially approved and information related to this ship’s particulars, etc. may still be revised as necessary. Therefore, said information should be considered to be only provisional at this time.
For reference, class registrations submitted for approval are formally discussed and evaluated by Board of Directors. The finalized version of a particular ship’s information is made available once said ship’s class has been officially approved by them.

Classification No. 728142
IMO No. 7238759
Official No. 02488 
Signal Letters LW3446 
Flag Argentina 
Port of Registry Buenos Aires 
Ship's Name MANGURUYU 
 
 
 
Classification Characters, Notations NS(RSU RE)(Tob)
MNS 
Installation Characters -- 
Special Description -- 
Other Classification -- 
 
Type of Ship -Purpose(intended service) OIL CARRIER 
- Certificates - SC/SE/SF
- OPP
- EE
- SMC/ISSC
 
Tonnage Gross (Registered) 1,000 
Tonnage Net (Registered) 726 
Tonnage Gross (Local) 1,000 
Tonnage Net (Local) 726 
Tonnage Gross (TM69) -- 
Tonnage Net (TM69) -- 
Deadweight 2,444 
 
Summer Freeboard (mm) 411 
Summer Draught (m) 5.449 
Lf (m) 67.000 
Continuous Max. Speed (kt)  sp;
(Sea Trial) :
12.5 
Equipment No. -- 
 
Overall Length (m) 76.000 
Moulded LxBxD (m) 70.500 x 11.200 x 5.850 
Registered LxBxD (m) 70.500 x 11.200 x 5.850 
 
Cargo Capacity  
(m3 / No. of Containers, etc.)
L 2,384.00 
No. of Passengers -- 
Capacity of Tanks (m3) FO 104.00 FW 52.00 
 
No. & Kind of Engines 1DE : 4 SA 6 CY 
Bore x Stroke (mm) 380.0 x 580.0 
Power (kW) 1,471 
Revolution (rpm) 294.0 
Manufacturer The Hanshin Diesel Works, Ltd. 
 
No. & Kind of Boilers 1 AUX WTB 
Pressure (MPa) 0.99 
Evaporation 4.00 (ton/h) 
Manufacturer NIPPON THERMOENER CO., LTD. 
*Evaporation rate: Thermal output (kW) to be filled up in case of TOH.
 
No. & Capacity of Generators (kVA) 2 AC 200 
Kind of Propeller Shaft 1A 
Fixed Method of Propeller Others 
No. & Shaft Diameter (mm) 1 x 240 
 
Shipbuilder Shimoda Dockyard Co., Ltd. 
Hull No. 222 
Date of Keel Lay 20 Jun 1972 
Date of Launch 12 Sep 1972 
Date of Build 07 Dec 1972 
Date of Conversion --