Last update : 14 Dec 2014

Out.rec Close
 

Condition Overdue from 08 Apr 2012

Laid up from 03 Apr 2012

 
REMARK


This ship’s class registration is still waiting to be officially approved and information related to this ship’s particulars, etc. may still be revised as necessary. Therefore, said information should be considered to be only provisional at this time.
For reference, class registrations submitted for approval are formally discussed and evaluated by Board of Directors. The finalized version of a particular ship’s information is made available once said ship’s class has been officially approved by them.

 
Classification No. : 921738
IMO No. : 9054614
Official No. : 377795 
Signal Letters : 5NQY3 
Flag : Nigerian 
Port of Registry : Lagos 
Ship's Name : SEA PROGRESS 
 
 
 
Classification Characters, Notations : NS*(Tm or ob)(ESP)
MNS* 
Installation Characters : CHG, MPP 
Special Description : -- 
Other Classification : -- 
 
Type of Ship -Purpose(intended service) : OIL/MOLASSES CARRIER 
- Certificates - SC/SE/SF :
- OPP :
- EE :
- SMC/ISSC :
 
Tonnage Gross (Registered) : 4,999 
Tonnage Net (Registered) : 3,026 
Tonnage Gross (Local) : -- 
Tonnage Net (Local) : -- 
Tonnage Gross (TM69) : 4,999 
Tonnage Net (TM69) : 3,026 
Deadweight : 9,268 
 
Summer Freeboard (mm) : 1,949 
Summer Draught (m) : 7.627 
Lf (m) : 108.000 
Continuous Max. Speed (kt)  sp;
(Sea Trial) :
14.6 
Equipment No. : 1,049 
 
Overall Length (m) : 115.280 
Moulded LxBxD (m) : 108.000 x 18.600 x 9.550 
Registered LxBxD (m) : 115.280 x 18.600 x 9.550 
 
Cargo Capacity  
(m3 / No. of Containers, etc.)
:
L 10,703.00 
No. of Passengers : -- 
Capacity of Tanks (m3) : FO 686.00 FW 264.00 
 
No. & Kind of Engines : 1DE : 2 SA 6 CY 
Bore x Stroke (mm) : 450.0 x 1,350.0 
Power (kW) : 4,501 
Revolution (rpm) : 158.0 
Manufacturer : Akasaka Diesels Ltd. 
 
No. & Kind of Boilers : 1 AUX VB 
Pressure (MPa) : 0.69 
Evaporation : 11.67 (ton/h) 
Manufacturer : Miura Co., Ltd. 
*Evaporation rate: Thermal output (kW) to be filled up in case of TOH.
 
No. & Capacity of Generators (kVA) : 4 AC 1,315 
Kind of Propeller Shaft : 1A 
Fixed Method of Propeller : -- 
No. & Shaft Diameter (mm) : 1 x 380 
 
Shipbuilder : Higaki Shipbuilding Co., Ltd. 
Hull No. : 410 
Date of Keel Lay : 05 Feb 1992 
Date of Launch : 31 Mar 1992 
Date of Build : 31 Jul 1992 
Date of Conversion : -- 
 
Top of Page