Last update : 2 Dec 2025
| Classification No. | 959730 | |
|---|---|---|
| IMO No. | 9104873 | |
| Official No. | 2437 | |
| Signal Letters | TCA3834 | |
| Flag | Türkiye | |
| Port of Registry | Istanbul | |
| Ship's Name | ALATEPE | |
| Former Name 1 | -- | |
| Registered Owner 1 | BEYKIM DENIZCILIK GEMI ISLETMECILIGI SAN. VE TIC. A.S. | |
| Management Company 1 | BEYKAR DENIZCILIK GEMI KIRALAMA TURIZM TICARET ANONIM SIRKETI | |
| Classification Characters, Notations | NS(TOB/CT II&III)(ESP)
MNS |
|
| Descriptive Notes | -- | |
| Installation Characters | CHG, MPP, LSA, RCF, M0, AFS, BWM, IHM | |
| Installation Descriptive Notes | ||
| Automatic and Remote Control Systems | The ship has complied with the requirements of Chapter II-1, Part E of SOLAS, "Periodically unattended machinery spaces (UMS)". | |
| Special Description | -- | |
| Other Classification | -- | |
| Type of Ship -Purpose(intended service) | OIL/CHEMICAL CARRIER | |
| - Certificates - SC/SE/SF | Oil tanker / Chemical tanker | |
| - OPP | Oil tanker | |
| - EE | Tanker | |
| - SMC/ISSC | Oil tanker / Chemical tanker | |
| Tonnage Gross (Registered) | 4,450 | |
| Tonnage Net (Registered) | 1,982 | |
| Tonnage Gross (Local) | -- | |
| Tonnage Net (Local) | -- | |
| Tonnage Gross (TM69) | 4,450 | |
| Tonnage Net (TM69) | 1,982 | |
| Deadweight | 6,239 | |
| Summer Freeboard (mm) | 1,662 | |
| Summer Draught (m) | 6.343 | |
| Lf (m) | 104.310 | |
| Continuous Max. Speed (kt) sp; (Sea Trial) : |
-- | |
| Equipment No. | 910 | |
| Overall Length (m) | 115.500 | |
| Moulded LxBxD (m) | 104.310 x 16.000 x 7.980 | |
| Registered LxBxD (m) | 104.310 x 16.000 x 7.980 | |
|
Cargo Capacity (m3 / No. of Containers, etc.) |
L 7,087.73 | |
| No. of Passengers | -- | |
| Capacity of Tanks (m3) | FO 329.08 FW 403.26 | |
| No. & Kind of Engines | 1DE : 4 SA 9 CY | |
| Bore x Stroke (mm) | 320.0 x 350.0 | |
| Power (kW) | 3,375 | |
| Revolution (rpm) | 750.0 | |
| Manufacturer | WARTSILA DIESEL OY | |
| No. & Kind of Boilers | 1 AUX TOH | |
| Pressure (MPa) | 1.00 | |
| Evaporation | 3,023.00 (kW) | |
| Manufacturer | -- | |
| No. & Kind of Boiler 2 | 1 AUX TOH | |
| Pressure (MPa) | 1.00 | |
| Evaporation | 1,861.00 (kW) | |
| Manufacturer | --
*Evaporation rate: Thermal output (kW) to be filled up in case of TOH. |
|
| No. & Capacity of Generators (kVA) | 4 AC 2,225 1 1,167 | |
| Kind of Propeller Shaft | 1B | |
| Fixed Method of Propeller | Flange | |
| No. & Shaft Diameter (mm) | 1 x 320 | |
| Shipbuilder | CANTIERE NAVALE MARIO MORINI S.P.A. | |
| Hull No. | 244 | |
| Date of Keel Lay | 20 Jun 1992 | |
| Date of Launch | 01 Apr 1995 | |
| Date of Build | 12 Sep 1995 | |
| Date of Conversion | -- | |