Classification No. 981183
IMO No. 9150339
Official No. 25612-98-E 
Signal Letters 3FHB8 
Flag Panama 
Port of Registry Panama 
Ship's Name AQUARIUS ACE 
Former Name 1 --
 
Registered Owner 1 AURORA CAR MARITIME TRANSPORT S.A.
 
Management Company 1 FAIRMONT SHIPPING (HK) LTD
 
Classification Characters, Notations NS*(VC, 1C)(IHM)
MNS* 
Descriptive Notes --
Installation Characters CHG, MPP, LSA, RCF, M0, AFS, BWM 
Installation Descriptive Notes 
Automatic and Remote Control Systems The ship has complied with the requirements of Chapter II-1, Part E of SOLAS, "Periodically unattended machinery spaces (UMS)".
Special Description -- 
Other Classification -- 
 
Type of Ship -Purpose(intended service) VEHICLES CARRIER 
- Certificates - SC/SE/SF Other cargo ship
- OPP Other than Oil Tanker
- EE Ro-ro cargo ship (Vehicle carrier)
- SMC/ISSC Other cargo ship
 
Tonnage Gross (Registered) 36,615 
Tonnage Net (Registered) 10,985 
Tonnage Gross (Local) -- 
Tonnage Net (Local) -- 
Tonnage Gross (TM69) 36,615 
Tonnage Net (TM69) 10,985 
Deadweight 14,353 
 
Summer Freeboard (mm) 2,986 
Summer Draught (m) 8.519 
Lf (m) 166.040 
Continuous Max. Speed (kt)  sp;
(Sea Trial) :
20.6 
Equipment No. 2,855 
 
Overall Length (m) 175.000 
Moulded LxBxD (m) 166.000 x 29.200 x 11.480 
Registered LxBxD (m) 169.510 x 29.200 x 20.740 
 
Cargo Capacity  
(m3 / No. of Containers, etc.)
CAR x 3,027 
No. of Passengers -- 
Capacity of Tanks (m3) FO 2,460.00 FW 346.00 
 
No. & Kind of Engines 1DE : 2 SA 8 CY 
Bore x Stroke (mm) 520.0 x 1,850.0 
Power (kW) 10,591 
Revolution (rpm) 120.0 
Manufacturer Kobe Diesel Co., Ltd. Nagasaki Works 
 
No. & Kind of Boilers 1 AUX VB 
Pressure (MPa) 0.69 
Evaporation 2.33 (ton/h) 
Manufacturer Tortoise Engineering Co., Ltd. 
*Evaporation rate: Thermal output (kW) to be filled up in case of TOH.
 
No. & Capacity of Generators (kVA) 4 AC 2,960 
Kind of Propeller Shaft 1C 
Fixed Method of Propeller Keyless 
No. & Shaft Diameter (mm) 1 x 600 
 
Shipbuilder Kanasashi Co., Ltd. Toyohashi Works 
Hull No. 3440 
Date of Keel Lay 22 Aug 1997 
Date of Launch 18 Oct 1997 
Date of Build 20 Mar 1998 
Date of Conversion --