Classification No. 990127
IMO No. 9181120
Official No. 141530331 
Signal Letters V3UJ3 
Flag Belize 
Port of Registry Belize City 
Ship's Name HIROKI 
Former Name 1 CHALLENGER KASSER
2 GLORY ACE
 
Registered Owner 1 HIROKI SHIPPING LTD.
 
Management Company 1 HIROKI SHIP MANAGEMENT LTD
 
Classification Characters, Notations NS*(BC)(ESP)
MNS* 
Descriptive Notes --
Installation Characters M0 
Installation Descriptive Notes 
Automatic and Remote Control Systems The ship has complied with the requirements of Chapter II-1, Part E of SOLAS, "Periodically unattended machinery spaces (UMS)".
Special Description -- 
Other Classification -- 
 
Type of Ship -Purpose(intended service) BULK CARRIER 
- Certificates - SC/SE/SF Bulk carrier (SOLAS IX Reg. 1.6)
- OPP Other than Oil Tanker
- EE Bulk carrier
- SMC/ISSC --
 
Tonnage Gross (Registered) 27,011 
Tonnage Net (Registered) 16,011 
Tonnage Gross (Local) -- 
Tonnage Net (Local) -- 
Tonnage Gross (TM69) 27,011 
Tonnage Net (TM69) 16,011 
Deadweight 46,620 
 
Summer Freeboard (mm) 4,918 
Summer Draught (m) 11.620 
Lf (m) 181.990 
Continuous Max. Speed (kt)  sp;
(Sea Trial) :
16.6 
Equipment No. 2,713 
 
Overall Length (m) 189.800 
Moulded LxBxD (m) 181.000 x 31.000 x 16.500 
Registered LxBxD (m) 181.990 x 31.000 x 16.500 
 
Cargo Capacity  
(m3 / No. of Containers, etc.)
B 57,237.00 G 59,820.00 
No. of Passengers -- 
Capacity of Tanks (m3) FO 1,877.00 FW 343.00 
 
No. & Kind of Engines 1DE : 2 SA 6 CY 
Bore x Stroke (mm) 500.0 x 1,910.0 
Power (kW) 7,428 
Revolution (rpm) 111.0 
Manufacturer Mitsui Engineering & Shipbuilding Co., Ltd. Tamano Works 
 
No. & Kind of Boilers 1 AUX VB 
Pressure (MPa) 0.69 
Evaporation 2.72 (ton/h) 
Manufacturer AALBORG(QINGDAO) BOILER COMPANY LTD. 
*Evaporation rate: Thermal output (kW) to be filled up in case of TOH.
 
No. & Capacity of Generators (kVA) 4 AC 1,975 
Kind of Propeller Shaft 1B 
Fixed Method of Propeller Keyless 
No. & Shaft Diameter (mm) 1 x 455 
 
Shipbuilder Mitsui Engineering & Shipbuilding Co., Ltd. Chiba Works 
Hull No. 1475 
Date of Keel Lay 21 May 1998 
Date of Launch 28 Sep 1998 
Date of Build 14 Jan 1999 
Date of Conversion --