Last update : 9 May 2025
Condition Overdue from 01 May 2025 |
||
Class Suspended from 01 May 2025 |
||
Classification No. : | 009348 | |
---|---|---|
IMO No. : | 9204491 | |
Official No. : | 142430540 | |
Signal Letters : | V3QZ2 | |
Flag : | Belize | |
Port of Registry : | Belize City | |
Ship's Name : | DARK OCEAN | |
Former Name 1 : | IAPETOS | |
2 : | CHASER | |
Registered Owner 1 : | MARMED LINES DMCC | |
Management Company 1 : | G.M.Z. SHIP MANAGEMENT CO. S.A. | |
Classification Characters, Notations : | NS(CNC, EQ C DG)(IA IS)(IWS)
MNS |
|
Descriptive Notes : | -- | |
Installation Characters : | CHG, MPP, LSA, RCF, M0, AFS, BWM | |
Installation Descriptive Notes | ||
Automatic and Remote Control Systems : | The ship has complied with the requirements of Chapter II-1, Part E of SOLAS, "Periodically unattended machinery spaces (UMS)". | |
Special Description : | -- | |
Other Classification : | -- | |
Type of Ship -Purpose(intended service) : | CONTAINER CARRIER | |
- Certificates - SC/SE/SF : | Other cargo ship | |
- OPP : | Other than Oil Tanker | |
- EE : | Container ship | |
- SMC/ISSC : | Other cargo ship | |
Tonnage Gross (Registered) : | 8,737 | |
Tonnage Net (Registered) : | 3,427 | |
Tonnage Gross (Local) : | -- | |
Tonnage Net (Local) : | -- | |
Tonnage Gross (TM69) : | 8,737 | |
Tonnage Net (TM69) : | 3,427 | |
Deadweight : | 9,113 | |
Summer Freeboard (mm) : | 3,414 | |
Summer Draught (m) : | -- | |
Lf (m) : | 122.538 | |
Continuous Max. Speed (kt) sp; (Sea Trial) : |
-- | |
Equipment No. : | -- | |
Overall Length (m) : | 133.280 | |
Moulded LxBxD (m) : | 122.540 x 22.900 x 11.100 | |
Registered LxBxD (m) : | 122.540 x 22.900 x 11.100 | |
Cargo Capacity (m3 / No. of Containers, etc.) : |
B 13,228.00 G 13,294.00 DRY; TEU 907 | |
No. of Passengers : | -- | |
Capacity of Tanks (m3) : | FO 984.90 FW 248.90 | |
No. & Kind of Engines : | 1DE : 4 SA 6 CY | |
Bore x Stroke (mm) : | 580.0 x 640.0 | |
Power (kW) : | 8,340 | |
Revolution (rpm) : | 428.0 | |
Manufacturer : | MAN Diesel & Turbo SE | |
No. & Kind of Boilers : | 1 AUX VB | |
Pressure (MPa) : | 0.90 | |
Evaporation : | -- | |
Manufacturer : | AALBORG BOILER PRODUCTION
*Evaporation rate: Thermal output (kW) to be filled up in case of TOH. |
|
No. & Capacity of Generators (kVA) : | 4 DC 2,163 | |
Kind of Propeller Shaft : | 1B | |
Fixed Method of Propeller : | Flange | |
No. & Shaft Diameter (mm) : | 1 x 400 | |
Shipbuilder : | STOCZNIA SZCZECINSKA SA | |
Hull No. : | B188/II/1 | |
Date of Keel Lay : | 14 Sep 1999 | |
Date of Launch : | 31 Oct 1999 | |
Date of Build : | 01 Jan 2000 | |
Date of Conversion : | -- | |