Classification No. 022772
IMO No. 9244295
Official No. 58264-PEXT-1 
Signal Letters 3E6989 
Flag Panama 
Port of Registry Panama 
Ship's Name GREAT YONGXI 
Former Name 1 JW FLORA
2 GREAT SHENG WEN
3 ZOE S
4 ELPIDA S
5 OCEAN EMPEROR
 
Registered Owner 1 HENG XIANG XIN LIMITED
 
Management Company 1 XIAMEN XINFENG SHIPPING CO., LIMITED
 
Classification Characters, Notations NS*(BC)(ESP)
MNS* 
Descriptive Notes 
Design Condition Strengthened for heavy cargo loading where hold nos. 2 & 4 may be empty
Installation Characters CHG, MPP, LSA, RCF, AFS, BWM, IHM 
Installation Descriptive Notes 
Special Description -- 
Other Classification -- 
 
Type of Ship -Purpose(intended service) BULK CARRIER 
- Certificates - SC/SE/SF Bulk carrier (SOLAS IX Reg. 1.6)
- OPP Other than Oil Tanker
- EE Bulk carrier
- SMC/ISSC Bulk carrier (SOLAS IX Reg. 1.6)
 
Tonnage Gross (Registered) 29,357 
Tonnage Net (Registered) 17,595 
Tonnage Gross (Local) -- 
Tonnage Net (Local) -- 
Tonnage Gross (TM69) 29,357 
Tonnage Net (TM69) 17,595 
Deadweight 53,054 
 
Summer Freeboard (mm) 5,026 
Summer Draught (m) 12.163 
Lf (m) 179.910 
Continuous Max. Speed (kt)  sp;
(Sea Trial) :
16.0 
Equipment No. 2,666 
 
Overall Length (m) 188.500 
Moulded LxBxD (m) 179.000 x 32.260 x 17.150 
Registered LxBxD (m) 179.910 x 32.260 x 17.150 
 
Cargo Capacity  
(m3 / No. of Containers, etc.)
B 65,295.00 G 66,416.00 
No. of Passengers -- 
Capacity of Tanks (m3) FO 1,960.60 FW 343.40 
 
No. & Kind of Engines 1DE : 2 SA 6 CY 
Bore x Stroke (mm) 500.0 x 2,000.0 
Power (kW) 7,685 
Revolution (rpm) 107.0 
Manufacturer Mitsui Engineering & Shipbuilding Co., Ltd. Tamano Works 
 
No. & Kind of Boilers 1 AUX VB 
Pressure (MPa) 0.69 
Evaporation 2.57 (ton/h) 
Manufacturer Osaka Boiler Mfg., Co., Ltd. 
*Evaporation rate: Thermal output (kW) to be filled up in case of TOH.
 
No. & Capacity of Generators (kVA) 4 AC 1,750 
Kind of Propeller Shaft 1B 
Fixed Method of Propeller Keyless 
No. & Shaft Diameter (mm) 1 x 475 
 
Shipbuilder OSHIMA SHIPBUILDING CO., LTD. 
Hull No. 10325 
Date of Keel Lay 31 May 2002 
Date of Launch 19 Oct 2002 
Date of Build 21 Nov 2002 
Date of Conversion --