Classification No. 029184
IMO No. 9255189
Official No. 5137 
Signal Letters V7BG8 
Flag Marshall Islands 
Port of Registry Majuro 
Ship's Name DS MANATEE 
Former Name 1 --
 
Registered Owner 1 DRAMAR INTERNATIONAL SA
 
Management Company 1 DRAMAR DENIZCILIK TICARET A.S.
 
Classification Characters, Notations NS(BC, GRAB)(ESP)
MNS 
Descriptive Notes --
Installation Characters CHG, MPP, LSA, RCF, M0, AFS, BWM 
Installation Descriptive Notes 
Automatic and Remote Control Systems The ship has complied with the requirements of Chapter II-1, Part E of SOLAS, "Periodically unattended machinery spaces (UMS)".
Special Description -- 
Other Classification -- 
 
Type of Ship -Purpose(intended service) BULK CARRIER 
- Certificates - SC/SE/SF Bulk carrier (SOLAS IX Reg. 1.6)
- OPP Other than Oil Tanker
- EE Bulk carrier
- SMC/ISSC Bulk carrier (SOLAS IX Reg. 1.6)
 
Tonnage Gross (Registered) 17,944 
Tonnage Net (Registered) 9,697 
Tonnage Gross (Local) -- 
Tonnage Net (Local) -- 
Tonnage Gross (TM69) 17,944 
Tonnage Net (TM69) 9,697 
Deadweight 27,129 
 
Summer Freeboard (mm) 4,152 
Summer Draught (m) 9.675 
Lf (m) 170.322 
Continuous Max. Speed (kt)  sp;
(Sea Trial) :
-- 
Equipment No. 2,090 
 
Overall Length (m) 178.430 
Moulded LxBxD (m) 169.000 x 26.000 x 13.800 
Registered LxBxD (m) 170.320 x 26.000 x 13.800 
 
Cargo Capacity  
(m3 / No. of Containers, etc.)
B 35,603.00 G 37,533.00 
No. of Passengers -- 
Capacity of Tanks (m3) FO 1,349.00 FW 193.00 
 
No. & Kind of Engines 1DE : 2 SA 7 CY 
Bore x Stroke (mm) 420.0 x 1,764.0 
Power (kW) 6,555 
Revolution (rpm) 131.0 
Manufacturer HUDONG HEAVY MACHINERY CO., LTD. 
 
No. & Kind of Boilers 1 AUX VB 
Pressure (MPa) 0.90 
Evaporation 2.00 (ton/h) 
Manufacturer AALBORG(QINGDAO) BOILER COMPANY LTD. 
*Evaporation rate: Thermal output (kW) to be filled up in case of TOH.
 
No. & Capacity of Generators (kVA) 4 AC 2,035 
Kind of Propeller Shaft 1B 
Fixed Method of Propeller Keyless 
No. & Shaft Diameter (mm) 1 x 444 
 
Shipbuilder NEW CENTURY SHIPBUILDING CO., LTD. 
Hull No. JS99-025 
Date of Keel Lay 06 Jan 2001 
Date of Launch 25 Jul 2001 
Date of Build 30 Jan 2002 
Date of Conversion --