Last update : 2 May 2025
Classification No. : | 072997 | |
---|---|---|
IMO No. : | 9317535 | |
Official No. : | 452/20 | |
Signal Letters : | A7HN | |
Flag : | Qatar | |
Port of Registry : | Doha | |
Ship's Name : | S'HAIL LUSAIL | |
Former Name 1 : | KURENAI | |
Registered Owner 1 : | S'HAIL SHIPPING AND MARITIME SERVICES | |
Management Company 1 : | ARKA GLOBAL MARINE SERVICES LLC | |
Classification Characters, Notations : | NS*(BC, 1C)(ESP)(PSCM)
MNS* |
|
Descriptive Notes : | -- | |
Installation Characters : | CHG, MPP, LSA, RCF, M0, AFS, BWM | |
Installation Descriptive Notes | ||
Automatic and Remote Control Systems : | The ship has complied with the requirements of Chapter II-1, Part E of SOLAS, "Periodically unattended machinery spaces (UMS)". | |
Special Description : | -- | |
Other Classification : | -- | |
Type of Ship -Purpose(intended service) : | BULK CARRIER | |
- Certificates - SC/SE/SF : | Bulk carrier (SOLAS IX Reg. 1.6) | |
- OPP : | Other than Oil Tanker | |
- EE : | Bulk carrier | |
- SMC/ISSC : | Bulk carrier (SOLAS IX Reg. 1.6) | |
Tonnage Gross (Registered) : | 46,462 | |
Tonnage Net (Registered) : | 26,846 | |
Tonnage Gross (Local) : | -- | |
Tonnage Net (Local) : | -- | |
Tonnage Gross (TM69) : | 46,462 | |
Tonnage Net (TM69) : | 26,846 | |
Deadweight : | 86,041 | |
Summer Freeboard (mm) : | 6,067 | |
Summer Draught (m) : | 13.870 | |
Lf (m) : | 223.320 | |
Continuous Max. Speed (kt) sp; (Sea Trial) : |
16.4 | |
Equipment No. : | 3,691 | |
Overall Length (m) : | 228.050 | |
Moulded LxBxD (m) : | 223.000 x 36.500 x 19.890 | |
Registered LxBxD (m) : | 223.000 x 36.500 x 19.890 | |
Cargo Capacity (m3 / No. of Containers, etc.) : |
B 101,794.00 G 103,482.00 | |
No. of Passengers : | -- | |
Capacity of Tanks (m3) : | FO 3,670.00 FW 532.00 | |
No. & Kind of Engines : | 1DE : 2 SA 5 CY | |
Bore x Stroke (mm) : | 600.0 x 2,400.0 | |
Power (kW) : | 11,290 | |
Revolution (rpm) : | 105.0 | |
Manufacturer : | MITSUI ENGINEERING & SHIPBUILDING CO., LTD. | |
No. & Kind of Boilers : | 1 AUX VB | |
Pressure (MPa) : | 0.69 | |
Evaporation : | 2.61 (ton/h) | |
Manufacturer : | AALBORG(QINGDAO) BOILER COMPANY LTD.
*Evaporation rate: Thermal output (kW) to be filled up in case of TOH. |
|
No. & Capacity of Generators (kVA) : | 4 AC 1,416 | |
Kind of Propeller Shaft : | 1C | |
Fixed Method of Propeller : | Keyless | |
No. & Shaft Diameter (mm) : | 1 x 535 | |
Shipbuilder : | Oshima Shipbuilding Co., Ltd. | |
Hull No. : | 10456 | |
Date of Keel Lay : | 27 Aug 2004 | |
Date of Launch : | 19 Jun 2007 | |
Date of Build : | 17 Jul 2007 | |
Date of Conversion : | -- | |