Classification No. 075093
IMO No. 9343699
Official No. 734018 
Signal Letters 8PMO6 
Flag Barbados 
Port of Registry Bridgetown 
Ship's Name GLEVIN 
Former Name 1 A KOU
2 MARCLOUD
 
Registered Owner 1 GLEVIN DMCC
 
Bareboat Charterer INTERCONT OVERSEAS FZE
 
Management Company 1 CAPRAMAR GEMI ISLETMECILIGI LTD. STI.
 
Classification Characters, Notations NS*(CNC, EQ C DG)(IWS)(IHM)
MNS* 
Descriptive Notes --
Installation Characters MPP, LSA, RCF, M0, AFS, BWM, IHM 
Installation Descriptive Notes 
Automatic and Remote Control Systems The ship has complied with the requirements of Chapter II-1, Part E of SOLAS, "Periodically unattended machinery spaces (UMS)".
Special Description -- 
Other Classification -- 
 
Type of Ship -Purpose(intended service) CONTAINER CARRIER 
- Certificates - SC/SE/SF Other cargo ship
- OPP Other than Oil Tanker
- EE Container ship
- SMC/ISSC Other cargo ship
 
Tonnage Gross (Registered) 9,610 
Tonnage Net (Registered) 4,745 
Tonnage Gross (Local) -- 
Tonnage Net (Local) -- 
Tonnage Gross (TM69) 9,610 
Tonnage Net (TM69) 4,745 
Deadweight 12,773 
 
Summer Freeboard (mm) 3,017 
Summer Draught (m) 8.214 
Lf (m) 134.660 
Continuous Max. Speed (kt)  sp;
(Sea Trial) :
18.9 
Equipment No. 1,742 
 
Overall Length (m) 142.700 
Moulded LxBxD (m) 133.500 x 22.600 x 11.200 
Registered LxBxD (m) 134.660 x 22.600 x 11.200 
 
Cargo Capacity  
(m3 / No. of Containers, etc.)
DRY; TEU 1,049 
No. of Passengers -- 
Capacity of Tanks (m3) FO 795.88 FW 213.80 
 
No. & Kind of Engines 1DE : 2 SA 6 CY 
Bore x Stroke (mm) 460.0 x 1,932.0 
Power (kW) 7,860 
Revolution (rpm) 129.0 
Manufacturer STX Engine Co., Ltd. 
 
No. & Kind of Boilers 1 AUX VB 
Pressure (MPa) 0.78 
Evaporation 1.62 (ton/h) 
Manufacturer MIURA PROTEC CO., LTD. 
*Evaporation rate: Thermal output (kW) to be filled up in case of TOH.
 
No. & Capacity of Generators (kVA) 4 AC 2,432 
Kind of Propeller Shaft 1B 
Fixed Method of Propeller Keyless 
No. & Shaft Diameter (mm) 1 x 460 
 
Shipbuilder DAE SUN SHIPBUILDING & ENGINEERING CO., LTD. 
Hull No. 463 
Date of Keel Lay 06 Jul 2007 
Date of Launch 13 Sep 2007 
Date of Build 19 Nov 2007 
Date of Conversion --