Last update : 6 Nov 2024
Classification No. : | 070186 | |
---|---|---|
IMO No. : | 9358632 | |
Official No. : | 5202 | |
Signal Letters : | V7BU6 | |
Flag : | Marshall Islands | |
Port of Registry : | Majuro | |
Ship's Name : | OM SHANGHAI | |
Former Name 1 : | CELSIUS MAYFAIR | |
2 : | SICHEM DEFENDER | |
Registered Owner 1 : | SILVER RIVER SHIPPING LIMITED | |
Management Company 1 : | FLEET MANAGEMENT LIMITED | |
Classification Characters, Notations : | NS*(TOB/CT II&III)(ESP)
MNS* |
|
Descriptive Notes : | -- | |
Installation Characters : | CHG, MPP, LSA, RCF, AFS, BWM | |
Installation Descriptive Notes | ||
Special Description : | -- | |
Other Classification : | -- | |
Type of Ship -Purpose(intended service) : | OIL/CHEMICAL CARRIER | |
- Certificates - SC/SE/SF : | Oil tanker / Chemical tanker | |
- OPP : | Oil tanker | |
- EE : | Tanker | |
- SMC/ISSC : | Oil tanker / Chemical tanker | |
Tonnage Gross (Registered) : | 11,660 | |
Tonnage Net (Registered) : | 6,295 | |
Tonnage Gross (Local) : | -- | |
Tonnage Net (Local) : | -- | |
Tonnage Gross (TM69) : | 11,660 | |
Tonnage Net (TM69) : | 6,295 | |
Deadweight : | 19,999 | |
Summer Freeboard (mm) : | 3,305 | |
Summer Draught (m) : | 9.632 | |
Lf (m) : | 136.460 | |
Continuous Max. Speed (kt) sp; (Sea Trial) : |
15.9 | |
Equipment No. : | 1,734 | |
Overall Length (m) : | 144.090 | |
Moulded LxBxD (m) : | 136.000 x 24.200 x 12.900 | |
Registered LxBxD (m) : | 136.460 x 24.200 x 12.900 | |
Cargo Capacity (m3 / No. of Containers, etc.) : |
L 22,157.00 | |
No. of Passengers : | -- | |
Capacity of Tanks (m3) : | FO 987.00 FW 385.00 | |
No. & Kind of Engines : | 1DE : 2 SA 7 CY | |
Bore x Stroke (mm) : | 450.0 x 1,350.0 | |
Power (kW) : | 6,230 | |
Revolution (rpm) : | 158.0 | |
Manufacturer : | AKASAKA DIESELS LTD. | |
No. & Kind of Boilers : | 1 AUX VB | |
Pressure (MPa) : | 0.93 | |
Evaporation : | 15.95 (ton/h) | |
Manufacturer : | TORTOISE ENGINEERING CO., LTD.
*Evaporation rate: Thermal output (kW) to be filled up in case of TOH. |
|
No. & Capacity of Generators (kVA) : | 4 AC 1,860 | |
Kind of Propeller Shaft : | 1A | |
Fixed Method of Propeller : | Keyed | |
No. & Shaft Diameter (mm) : | 1 x 410 | |
Shipbuilder : | Fukuoka Shipbuilding Co., Ltd. | |
Hull No. : | 1262 | |
Date of Keel Lay : | 26 Jul 2006 | |
Date of Launch : | 07 Oct 2006 | |
Date of Build : | 09 Jan 2007 | |
Date of Conversion : | -- | |