Last update : 27 Sep 2026
| Classification No. | 061037 | |
|---|---|---|
| IMO No. | 9382607 | |
| Official No. | 330642 | |
| Signal Letters | 9WGG4 | |
| Flag | Malaysia | |
| Port of Registry | Kuching | |
| Ship's Name | WM EASTERNLINE I | |
| Former Name 1 | -- | |
| Registered Owner 1 | SHIN YANG SHIPPING SDN.BHD. | |
| Management Company 1 | SHIN YANG SHIPPING SDN. BHD. | |
| Classification Characters, Notations | NS*(TUG)
MNS* |
|
| Descriptive Notes | -- | |
| Installation Characters | LSA, RCF | |
| Installation Descriptive Notes | ||
| Special Description | -- | |
| Other Classification | -- | |
| Type of Ship -Purpose(intended service) | TUG | |
| - Certificates - SC/SE/SF | -- | |
| - OPP | -- | |
| - EE | -- | |
| - SMC/ISSC | -- | |
| Tonnage Gross (Registered) | 319 | |
| Tonnage Net (Registered) | 96 | |
| Tonnage Gross (Local) | -- | |
| Tonnage Net (Local) | -- | |
| Tonnage Gross (TM69) | 319 | |
| Tonnage Net (TM69) | 96 | |
| Deadweight | 287 | |
| Summer Freeboard (mm) | 809 | |
| Summer Draught (m) | 3.512 | |
| Lf (m) | 28.660 | |
| Continuous Max. Speed (kt) sp; (Sea Trial) : |
-- | |
| Equipment No. | 182 | |
| Overall Length (m) | 31.000 | |
| Moulded LxBxD (m) | 28.590 x 9.150 x 4.300 | |
| Registered LxBxD (m) | 28.660 x 9.150 x 4.300 | |
|
Cargo Capacity (m3 / No. of Containers, etc.) |
-- | |
| No. of Passengers | -- | |
| Capacity of Tanks (m3) | FO 266.57 FW 44.06 | |
| No. & Kind of Engines | 2DE : 4 SA 12 CY | |
| Bore x Stroke (mm) | 159.0 x 159.0 | |
| Power (kW) | 1,492 (746 x 2) | |
| Revolution (rpm) | 1,800.0 | |
| Manufacturer | CUMMINS INDUSTRIAL CENTER | |
| No. & Kind of Boilers | -- | |
| Pressure (MPa) | -- | |
| Evaporation | -- | |
| Manufacturer | --
*Evaporation rate: Thermal output (kW) to be filled up in case of TOH. |
|
| No. & Capacity of Generators (kVA) | 2 AC 194 | |
| Kind of Propeller Shaft | 1A | |
| Fixed Method of Propeller | Keyed, Keyed | |
| No. & Shaft Diameter (mm) | 2 x 177 | |
| Shipbuilder | BERJAYA DOCKYARD SDN. BHD. | |
| Hull No. | BJ24 | |
| Date of Keel Lay | 15 May 2005 | |
| Date of Launch | 12 Jan 2006 | |
| Date of Build | 14 Mar 2006 | |
| Date of Conversion | -- | |