Classification No. 093441
IMO No. 9385025
Official No. 398727 
Signal Letters 9V2196 
Flag Singapore 
Port of Registry Singapore 
Ship's Name WAN HAI 621 
Former Name 1 HYUNDAI NEW YORK
 
Registered Owner 1 WAN HAI LINES (SINGAPORE) PTE LTD
 
Management Company 1 COLUMBIA SHIPMANAGEMENT (S) PTE LTD
 
Classification Characters, Notations NS*(CNC, EQ C DG, 1C)(IWS)(IHM)
MNS* 
Descriptive Notes --
Installation Characters MPP, LSA, RCF, M0, AFS, BWM 
Installation Descriptive Notes 
Automatic and Remote Control Systems The ship has complied with the requirements of Chapter II-1, Part E of SOLAS, "Periodically unattended machinery spaces (UMS)".
Special Description -- 
Other Classification -- 
 
Type of Ship -Purpose(intended service) CONTAINER CARRIER 
- Certificates - SC/SE/SF Other cargo ship
- OPP Other than Oil Tanker
- EE Container ship
- SMC/ISSC --
 
Tonnage Gross (Registered) 71,806 
Tonnage Net (Registered) 26,914 
Tonnage Gross (Local) -- 
Tonnage Net (Local) -- 
Tonnage Gross (TM69) 71,806 
Tonnage Net (TM69) 26,914 
Deadweight 72,982 
 
Summer Freeboard (mm) 5,416 
Summer Draught (m) 14.021 
Lf (m) 276.750 
Continuous Max. Speed (kt)  sp;
(Sea Trial) :
29.0 
Equipment No. 5,395 
 
Overall Length (m) 293.180 
Moulded LxBxD (m) 276.000 x 40.000 x 19.400 
Registered LxBxD (m) 279.770 x 40.000 x 24.300 
 
Cargo Capacity  
(m3 / No. of Containers, etc.)
DRY; TEU 6,350 FEU 3,024 
No. of Passengers -- 
Capacity of Tanks (m3) FO 10,232.00 FW 389.00 
 
No. & Kind of Engines 1DE : 2 SA 11 CY 
Bore x Stroke (mm) 980.0 x 2,660.0 
Power (kW) 62,920 
Revolution (rpm) 94.0 
Manufacturer MITSUI ENGINEERING & SHIPBUILDING CO., LTD.  
 
No. & Kind of Boilers 1 AUX VB 
Pressure (MPa) 0.80 
Evaporation 10.58 (ton/h) 
Manufacturer OSAKA BOILER MFG., CO., LTD. 
*Evaporation rate: Thermal output (kW) to be filled up in case of TOH.
 
No. & Capacity of Generators (kVA) 5 AC 12,650 
Kind of Propeller Shaft 1C 
Fixed Method of Propeller Keyless 
No. & Shaft Diameter (mm) 1 x 1130 
 
Shipbuilder Koyo Dockyard Co., Ltd. 
Hull No. 2248 
Date of Keel Lay 05 Nov 2008 
Date of Launch 11 May 2009 
Date of Build 31 Jul 2009 
Date of Conversion --