Last update : 14 Jun 2023
Laid up from 23 Jun 2022 |
||
Classification No. : | 082958 | |
---|---|---|
IMO No. : | 9416056 | |
Official No. : | 5769 | |
Signal Letters : | V7GV7 | |
Flag : | Marshall Islands | |
Port of Registry : | Majuro | |
Ship's Name : | TRF MIAMI | |
Former Name 1 : | MAEMI II | |
2 : | VIDDEN | |
Registered Owner 1 : | WLR/TRF MAEMI LLC | |
Management Company 1 : | FLEET MANAGEMENT LIMITED | |
Classification Characters, Notations : | NS*(TOB/CT II&III)(ESP)(SOx(EGCS))
MNS* |
|
Descriptive Notes | ||
Other : | SOx-EGCS-M/E, G/E(Nos.1, 2, 3), A/B | |
Installation Characters : | CHG, MPP, LSA, RCF, AFS, BWM | |
Installation Descriptive Notes | ||
Special Description : | -- | |
Other Classification : | -- | |
Type of Ship -Purpose(intended service) : | OIL/CHEMICAL CARRIER | |
- Certificates - SC/SE/SF : | Oil tanker / Chemical tanker | |
- OPP : | Oil tanker | |
- EE : | Tanker | |
- SMC/ISSC : | Oil tanker / Chemical tanker | |
Tonnage Gross (Registered) : | 11,872 | |
Tonnage Net (Registered) : | 6,138 | |
Tonnage Gross (Local) : | -- | |
Tonnage Net (Local) : | -- | |
Tonnage Gross (TM69) : | 11,872 | |
Tonnage Net (TM69) : | 6,138 | |
Deadweight : | 19,764 | |
Summer Freeboard (mm) : | 3,414 | |
Summer Draught (m) : | 9.622 | |
Lf (m) : | 138.500 | |
Continuous Max. Speed (kt) sp; (Sea Trial) : |
16.4 | |
Equipment No. : | 1,742 | |
Overall Length (m) : | 146.600 | |
Moulded LxBxD (m) : | 138.000 x 23.700 x 13.000 | |
Registered LxBxD (m) : | 138.500 x 23.700 x 13.000 | |
Cargo Capacity (m3 / No. of Containers, etc.) : |
L 22,060.00 | |
No. of Passengers : | -- | |
Capacity of Tanks (m3) : | FO 1,032.00 FW 472.00 | |
No. & Kind of Engines : | 1DE : 2 SA 6 CY | |
Bore x Stroke (mm) : | 420.0 x 1,764.0 | |
Power (kW) : | 6,150 | |
Revolution (rpm) : | 136.0 | |
Manufacturer : | IMEX CO., LTD. | |
No. & Kind of Boilers : | 1 AUX VB | |
Pressure (MPa) : | 0.98 | |
Evaporation : | 18.87 (ton/h) | |
Manufacturer : | MIURA PROTEC CO., LTD.
*Evaporation rate: Thermal output (kW) to be filled up in case of TOH. |
|
No. & Capacity of Generators (kVA) : | 4 AC 2,160 | |
Kind of Propeller Shaft : | 1A | |
Fixed Method of Propeller : | Keyed | |
No. & Shaft Diameter (mm) : | 1 x 430 | |
Shipbuilder : | Fukuoka Shipbuilding Co., Ltd. | |
Hull No. : | F-1270 | |
Date of Keel Lay : | 26 Dec 2007 | |
Date of Launch : | 08 Mar 2008 | |
Date of Build : | 13 Jun 2008 | |
Date of Conversion : | -- | |