Classification No. 090993
IMO No. 9416965
Official No. 40325-09-B 
Signal Letters 3FPB5 
Flag Panama 
Port of Registry Panama 
Ship's Name NYK REMUS 
Former Name 1 --
 
Registered Owner 1 MOET SHIPHOLDING S.A
 
Management Company 1 NYK SHIPMANAGEMENT PTE LTD
 
Classification Characters, Notations NS*(CNC, EQ C DG, 1C)(PS-DA&FA)(IWS)(PSCM)(IHM)
MNS* 
Descriptive Notes --
Installation Characters MPP, LSA, RCF, M0, AFS, BWM 
Installation Descriptive Notes 
Automatic and Remote Control Systems The ship has complied with the requirements of Chapter II-1, Part E of SOLAS, "Periodically unattended machinery spaces (UMS)".
Special Description -- 
Other Classification -- 
 
Type of Ship -Purpose(intended service) CONTAINER CARRIER 
- Certificates - SC/SE/SF Other cargo ship
- OPP Other than Oil Tanker
- EE Container ship
- SMC/ISSC Other cargo ship
 
Tonnage Gross (Registered) 55,487 
Tonnage Net (Registered) 23,203 
Tonnage Gross (Local) -- 
Tonnage Net (Local) -- 
Tonnage Gross (TM69) 55,487 
Tonnage Net (TM69) 23,203 
Deadweight 65,981 
 
Summer Freeboard (mm) 3,867 
Summer Draught (m) 13.521 
Lf (m) 283.810 
Continuous Max. Speed (kt)  sp;
(Sea Trial) :
27.5 
Equipment No. 4,383 
 
Overall Length (m) 294.120 
Moulded LxBxD (m) 283.200 x 32.200 x 21.800 
Registered LxBxD (m) 285.790 x 32.200 x 21.800 
 
Cargo Capacity  
(m3 / No. of Containers, etc.)
DRY; TEU 4,888 FEU 2,413 REF; FEU 330 
No. of Passengers -- 
Capacity of Tanks (m3) FO 6,999.00 FW 456.00 
 
No. & Kind of Engines 1DE : 2 SA 9 CY 
Bore x Stroke (mm) 980.0 x 2,400.0 
Power (kW) 51,390 
Revolution (rpm) 104.0 
Manufacturer HYUNDAI HEAVY INDUSTRIES CO., LTD. 
 
No. & Kind of Boilers 1 AUX VB 
Pressure (MPa) 0.78 
Evaporation 10.28 (ton/h) 
Manufacturer KANG RIM IND.CO.,LTD. 
*Evaporation rate: Thermal output (kW) to be filled up in case of TOH.
 
No. & Capacity of Generators (kVA) 5 AC 8,688 
Kind of Propeller Shaft 1C 
Fixed Method of Propeller Keyless 
No. & Shaft Diameter (mm) 1 x 880 
 
Shipbuilder HYUNDAI SAMHO HEAVY INDUSTRIES CO., LTD. 
Hull No. S373 
Date of Keel Lay 28 Oct 2008 
Date of Launch 09 Jan 2009 
Date of Build 27 Mar 2009 
Date of Conversion --