Classification No. 111679
IMO No. 9463293
Official No. 42657-11-B 
Signal Letters 3FBQ5 
Flag Panama 
Port of Registry Panama 
Ship's Name BEAR MOUNTAIN BRIDGE 
Former Name 1 --
 
Registered Owner 1 G.O.D. SHIPPING S.A.
 
Management Company 1 SYNERGY MARITIME PRIVATE LIMITED
 
Classification Characters, Notations NS*(CNC, EQ C DG, 1C)(IWS)(PSCM)
MNS* 
Descriptive Notes --
Installation Characters CHG, MPP, LSA, RCF, M0, AFS, BWM 
Installation Descriptive Notes 
Automatic and Remote Control Systems The ship has complied with the requirements of Chapter II-1, Part E of SOLAS, "Periodically unattended machinery spaces (UMS)".
Special Description -- 
Other Classification -- 
 
Type of Ship -Purpose(intended service) CONTAINER CARRIER 
- Certificates - SC/SE/SF Other cargo ship
- OPP Other than Oil Tanker
- EE Container ship
- SMC/ISSC Other cargo ship
 
Tonnage Gross (Registered) 44,234 
Tonnage Net (Registered) 24,146 
Tonnage Gross (Local) -- 
Tonnage Net (Local) -- 
Tonnage Gross (TM69) 44,234 
Tonnage Net (TM69) 24,146 
Deadweight 52,118 
 
Summer Freeboard (mm) 4,100 
Summer Draught (m) 12.722 
Lf (m) 250.920 
Continuous Max. Speed (kt)  sp;
(Sea Trial) :
27.2 
Equipment No. 4,296 
 
Overall Length (m) 266.650 
Moulded LxBxD (m) 250.000 x 35.400 x 16.800 
Registered LxBxD (m) 250.920 x 35.400 x 16.800 
 
Cargo Capacity  
(m3 / No. of Containers, etc.)
DRY; TEU 4,432 FEU 2,198 REF; FEU 408 
No. of Passengers -- 
Capacity of Tanks (m3) FO 6,498.00 FW 489.00 
 
No. & Kind of Engines 1DE : 2 SA 10 CY 
Bore x Stroke (mm) 820.0 x 2,646.0 
Power (kW) 40,680 
Revolution (rpm) 102.0 
Manufacturer HYUNDAI HEAVY INDUSTRIES CO., LTD. 
 
No. & Kind of Boilers 1 AUX VB 
Pressure (MPa) 0.79 
Evaporation 8.31 (ton/h) 
Manufacturer AALBORG(QINGDAO) BOILER COMPANY LTD. 
*Evaporation rate: Thermal output (kW) to be filled up in case of TOH.
 
No. & Capacity of Generators (kVA) 5 AC 8,188 
Kind of Propeller Shaft 1C 
Fixed Method of Propeller Keyless 
No. & Shaft Diameter (mm) 1 x 820 
 
Shipbuilder HYUNDAI HEAVY INDUSTRIES CO., LTD. 
Hull No. 2128 
Date of Keel Lay 21 Dec 2010 
Date of Launch 25 Feb 2011 
Date of Build 15 Apr 2011 
Date of Conversion --