Classification No. 125405
IMO No. 9468138
Official No. 9468138 
Signal Letters 9HA3101 
Flag Malta 
Port of Registry Valletta 
Ship's Name DIAMOND SKY 
Former Name 1 --
 
Registered Owner 1 ODRIA LTD
 
Management Company 1 IHB SHIPPING Co.-EAD
 
Classification Characters, Notations NS*(CSR, BC-A, BC-XII, GRAB 20, EQ C DG, EQ C C, PSPC-WBT, 1C)(ESP)(IWS)
MNS* 
Descriptive Notes 
Design Condition Strengthened for heavy cargo loading where hold nos. 2 & 4 may be empty
Installation Characters CHG, MPP, LSA, RCF, M0, AFS, BWM 
Installation Descriptive Notes 
Automatic and Remote Control Systems The ship has complied with the requirements of Chapter II-1, Part E of SOLAS, "Periodically unattended machinery spaces (UMS)".
Special Description -- 
Other Classification -- 
 
Type of Ship -Purpose(intended service) BULK CARRIER 
- Certificates - SC/SE/SF Bulk carrier (SOLAS IX Reg. 1.6)
- OPP Other than Oil Tanker
- EE Bulk carrier
- SMC/ISSC --
 
Tonnage Gross (Registered) 31,617 
Tonnage Net (Registered) 18,781 
Tonnage Gross (Local) -- 
Tonnage Net (Local) -- 
Tonnage Gross (TM69) 31,617 
Tonnage Net (TM69) 18,781 
Deadweight 55,304 
 
Summer Freeboard (mm) 5,427 
Summer Draught (m) 12.735 
Lf (m) 186.480 
Continuous Max. Speed (kt)  sp;
(Sea Trial) :
15.7 
Equipment No. 3,036 
 
Overall Length (m) 190.000 
Moulded LxBxD (m) 185.000 x 32.260 x 18.100 
Registered LxBxD (m) 186.480 x 32.260 x 18.100 
 
Cargo Capacity  
(m3 / No. of Containers, etc.)
B 69,436.00 G 72,062.00 
No. of Passengers -- 
Capacity of Tanks (m3) FO 2,492.00 FW 311.00 
 
No. & Kind of Engines 1DE : 2 SA 6 CY 
Bore x Stroke (mm) 500.0 x 2,050.0 
Power (kW) 8,890 
Revolution (rpm) 116.0 
Manufacturer DIESEL UNITED, LTD. 
 
No. & Kind of Boilers 1 AUX VB 
Pressure (MPa) 0.69 
Evaporation 2.49 (ton/h) 
Manufacturer MIURA CO., LTD. 
*Evaporation rate: Thermal output (kW) to be filled up in case of TOH.
 
No. & Capacity of Generators (kVA) 4 AC 1,711 
Kind of Propeller Shaft 1C 
Fixed Method of Propeller Keyless 
No. & Shaft Diameter (mm) 1 x 490 
 
Shipbuilder BULYARD SHIPBUILDING INDUSTRY EAD 
Hull No. 102 
Date of Keel Lay 20 Dec 2010 
Date of Launch 25 Jun 2012 
Date of Build 25 Oct 2012 
Date of Conversion --