Classification No. 111518
IMO No. 9567661
Official No. 42676-11-D 
Signal Letters 3FTU 
Flag Panama 
Port of Registry Panama 
Ship's Name SEROJA LIMA 
Former Name 1 APL FRANCE
2 SEROJA LIMA
 
Registered Owner 1 LEO OCEAN, S.A.
2 TOKEI KAIUN LTD.
 
Management Company 1 --
 
Classification Characters, Notations NS*(CNC, EQ C DG, 1C)(IWS)(IHM)
MNS* 
Descriptive Notes --
Installation Characters CHG, MPP, LSA, RCF, M0, AFS, BWM 
Installation Descriptive Notes 
Automatic and Remote Control Systems The ship has complied with the requirements of Chapter II-1, Part E of SOLAS, "Periodically unattended machinery spaces (UMS)".
Special Description -- 
Other Classification -- 
 
Type of Ship -Purpose(intended service) CONTAINER CARRIER 
- Certificates - SC/SE/SF Containership (SC: Other cargo ship)
- OPP Other than Oil Tanker
- EE Container ship
- SMC/ISSC Other cargo ship
 
Tonnage Gross (Registered) 86,682 
Tonnage Net (Registered) 47,960 
Tonnage Gross (Local) -- 
Tonnage Net (Local) -- 
Tonnage Gross (TM69) 86,682 
Tonnage Net (TM69) 47,960 
Deadweight 90,388 
 
Summer Freeboard (mm) 5,859 
Summer Draught (m) 14.535 
Lf (m) 303.180 
Continuous Max. Speed (kt)  sp;
(Sea Trial) :
27.6 
Equipment No. 6,560 
 
Overall Length (m) 316.000 
Moulded LxBxD (m) 302.000 x 45.600 x 25.000 
Registered LxBxD (m) 303.180 x 45.600 x 20.340 
 
Cargo Capacity  
(m3 / No. of Containers, etc.)
DRY; TEU 8,540 FEU 4,245 REF; TEU 630 FEU 630 
No. of Passengers -- 
Capacity of Tanks (m3) FO 8,792.00 FW 534.00 
 
No. & Kind of Engines 1DE : 2 SA 11 CY 
Bore x Stroke (mm) 980.0 x 2,400.0 
Power (kW) 62,810 
Revolution (rpm) 104.0 
Manufacturer MITSUI ENGINEERING & SHIPBUILDING CO., LTD. TAMANO WORKS  
 
No. & Kind of Boilers 1 AUX VB 
Pressure (MPa) 0.78 
Evaporation 8.50 (ton/h) 
Manufacturer OSAKA BOILER MFG., CO., LTD. 
*Evaporation rate: Thermal output (kW) to be filled up in case of TOH.
 
No. & Capacity of Generators (kVA) 5 AC 12,750 
Kind of Propeller Shaft 1C 
Fixed Method of Propeller Keyless 
No. & Shaft Diameter (mm) 1 x 1000 
 
Shipbuilder MITSUBISHI HEAVY INDUSTRIES, LTD. NAGASAKI SHIPYARD & MACHINERY WORKS 
Hull No. 2268 
Date of Keel Lay 16 Apr 2010 
Date of Launch 20 Dec 2010 
Date of Build 29 Mar 2011 
Date of Conversion --