Last update : 17 Oct 2025
Classification No. | 124451 | |
---|---|---|
IMO No. | 9638824 | |
Official No. | HK-6134 | |
Signal Letters | VRXE3 | |
Flag | Hong Kong, China | |
Port of Registry | HONG KONG | |
Ship's Name | BAO FUNG | |
Former Name 1 | AFRICAN JACANA | |
Registered Owner 1 | Bao Fung Shipping Co., Limited | |
Management Company 1 | HTM SHIPPING CO., LTD. | |
Classification Characters, Notations | NS*(CSR, BC-A, BC-XII, GRAB 20, PSPC-WBT, 1C)(ESP)(IWS)(PSCM)
MNS* |
|
Descriptive Notes | ||
Design Condition | Strengthened for heavy cargo loading where hold nos. 2 & 4 may be empty | |
Installation Characters | CHG, MPP, LSA, RCF, M0, AFS, BWM, IHM | |
Installation Descriptive Notes | ||
Automatic and Remote Control Systems | The ship has complied with the requirements of Chapter II-1, Part E of SOLAS, "Periodically unattended machinery spaces (UMS)". | |
Special Description | -- | |
Other Classification | -- | |
Type of Ship -Purpose(intended service) | BULK CARRIER | |
- Certificates - SC/SE/SF | Bulk carrier (SOLAS IX Reg. 1.6) | |
- OPP | Other than Oil Tanker | |
- EE | Bulk carrier | |
- SMC/ISSC | Bulk carrier (SOLAS IX Reg. 1.6) | |
Tonnage Gross (Registered) | 33,193 | |
Tonnage Net (Registered) | 19,143 | |
Tonnage Gross (Local) | -- | |
Tonnage Net (Local) | -- | |
Tonnage Gross (TM69) | 33,193 | |
Tonnage Net (TM69) | 19,143 | |
Deadweight | 58,753 | |
Summer Freeboard (mm) | 5,477 | |
Summer Draught (m) | 12.676 | |
Lf (m) | 194.000 | |
Continuous Max. Speed (kt) sp; (Sea Trial) : |
15.8 | |
Equipment No. | 3,108 | |
Overall Length (m) | 197.000 | |
Moulded LxBxD (m) | 194.000 x 32.260 x 18.100 | |
Registered LxBxD (m) | 194.000 x 32.260 x 18.100 | |
Cargo Capacity (m3 / No. of Containers, etc.) |
G 73,689.00 | |
No. of Passengers | -- | |
Capacity of Tanks (m3) | FO 2,240.00 FW 391.00 | |
No. & Kind of Engines | 1DE : 2 SA 6 CY | |
Bore x Stroke (mm) | 500.0 x 2,000.0 | |
Power (kW) | 8,630 | |
Revolution (rpm) | 116.0 | |
Manufacturer | HUDONG HEAVY MACHINERY CO., LTD. | |
No. & Kind of Boilers | 1 AUX VB | |
Pressure (MPa) | 0.80 | |
Evaporation | 3.34 (ton/h) | |
Manufacturer | Alfa Laval Aalborg Ltd.
*Evaporation rate: Thermal output (kW) to be filled up in case of TOH. |
|
No. & Capacity of Generators (kVA) | 4 AC 2,035 | |
Kind of Propeller Shaft | 1C | |
Fixed Method of Propeller | Keyless | |
No. & Shaft Diameter (mm) | 1 x 490 | |
Shipbuilder | NANTONG COSCO KHI SHIP ENGINEERING CO., LTD. | |
Hull No. | NE137 | |
Date of Keel Lay | 21 Dec 2011 | |
Date of Launch | 23 Aug 2012 | |
Date of Build | 31 Oct 2012 | |
Date of Conversion | -- | |