Classification No. 144976
IMO No. 9687746
Official No. 46291-14-C 
Signal Letters HPFF 
Flag Panama 
Port of Registry Panama 
Ship's Name GLOBAL CORAL 
Former Name 1 --
 
Registered Owner 1 OCEAN TRANSIT CARRIER S.A.
 
Management Company 1 MMS CO., LTD.
 
Classification Characters, Notations NS*(BCM, BC-XII, GRAB, PSPC-WBT)(IWS)(IHM)
MNS* 
Descriptive Notes 
Design Condition Strengthened for heavy cargo loading where hold nos. 2 & 4 may be empty / Double hull construction applied to all cargo holds
Installation Characters CHG, MPP, LSA, RCF, AFS, BWM 
Installation Descriptive Notes 
Special Description -- 
Other Classification -- 
 
Type of Ship -Purpose(intended service) BULK CARRIER 
- Certificates - SC/SE/SF Bulk carrier (SOLAS XII Reg. 1.1)
- OPP Other than Oil Tanker
- EE General cargo ship
- SMC/ISSC Other cargo ship
 
Tonnage Gross (Registered) 27,460 
Tonnage Net (Registered) 14,609 
Tonnage Gross (Local) -- 
Tonnage Net (Local) -- 
Tonnage Gross (TM69) 27,460 
Tonnage Net (TM69) 14,609 
Deadweight 45,418 
 
Summer Freeboard (mm) 4,945 
Summer Draught (m) 11.614 
Lf (m) 179.600 
Continuous Max. Speed (kt)  sp;
(Sea Trial) :
15.6 
Equipment No. 2,696 
 
Overall Length (m) 182.990 
Moulded LxBxD (m) 179.600 x 30.400 x 16.500 
Registered LxBxD (m) 179.600 x 30.400 x 16.500 
 
Cargo Capacity  
(m3 / No. of Containers, etc.)
B 53,620.00 G 56,269.00 
No. of Passengers -- 
Capacity of Tanks (m3) FO 1,891.00 FW 369.00 
 
No. & Kind of Engines 1DE : 2 SA 6 CY 
Bore x Stroke (mm) 500.0 x 2,000.0 
Power (kW) 6,830 
Revolution (rpm) 108.0 
Manufacturer MITSUI ENGINEERING & SHIPBUILDING CO., LTD. TAMANO WORKS  
 
No. & Kind of Boilers 1 AUX VB 
Pressure (MPa) 0.70 
Evaporation 2.28 (ton/h) 
Manufacturer OSAKA BOILER MFG., CO., LTD. 
*Evaporation rate: Thermal output (kW) to be filled up in case of TOH.
 
No. & Capacity of Generators (kVA) 4 AC 2,014 
Kind of Propeller Shaft 1B 
Fixed Method of Propeller Keyless 
No. & Shaft Diameter (mm) 1 x 490 
 
Shipbuilder TSUNEISHI HEAVY INDUSTRIES (CEBU), INC. 
Hull No. 217 
Date of Keel Lay 26 Oct 2013 
Date of Launch 15 Aug 2014 
Date of Build 24 Oct 2014 
Date of Conversion --