Classification No. 159208
IMO No. 9697428
Official No. 400884 
Signal Letters 9V5283 
Flag Singapore 
Port of Registry Singapore 
Ship's Name DALI 
Former Name 1 --
 
Registered Owner 1 GRACE OCEAN PRIVATE LIMITED
 
Management Company 1 SYNERGY MARINE PTE. LTD.
 
Classification Characters, Notations NS(CNC, EQ C DG, PSPC-WBT)(IWS)(PSCM)(BWTS)(IHM)(CSSA-R)
MNS 
Descriptive Notes --
Installation Characters CHG, MPP, LSA, RCF, M0, AFS, BWM 
Installation Descriptive Notes 
Automatic and Remote Control Systems The ship has complied with the requirements of Chapter II-1, Part E of SOLAS, "Periodically unattended machinery spaces (UMS)".
Special Description -- 
Other Classification -- 
 
Type of Ship -Purpose(intended service) CONTAINER CARRIER 
- Certificates - SC/SE/SF Other cargo ship
- OPP Other than Oil Tanker
- EE Container ship
- SMC/ISSC Other cargo ship
 
Tonnage Gross (Registered) 95,128 
Tonnage Net (Registered) 52,150 
Tonnage Gross (Local) -- 
Tonnage Net (Local) -- 
Tonnage Gross (TM69) 95,128 
Tonnage Net (TM69) 52,150 
Deadweight 116,851 
 
Summer Freeboard (mm) 9,880 
Summer Draught (m) 15.030 
Lf (m) 288.760 
Continuous Max. Speed (kt)  sp;
(Sea Trial) :
-- 
Equipment No. -- 
 
Overall Length (m) 299.920 
Moulded LxBxD (m) 287.000 x 48.200 x 24.800 
Registered LxBxD (m) 289.150 x 48.200 x 21.110 
 
Cargo Capacity  
(m3 / No. of Containers, etc.)
DRY; TEU 9,971 
No. of Passengers -- 
Capacity of Tanks (m3) FO 8,344.70 FW 606.60 
 
No. & Kind of Engines 1DE : 2 SA 9 CY 
Bore x Stroke (mm) 900.0 x 3,260.0 
Power (kW) 41,480 
Revolution (rpm) 82.5 
Manufacturer HYUNDAI HEAVY INDUSTRIES CO., LTD. 
 
No. & Kind of Boilers 1 AUX VB 
Pressure (MPa) 0.90 
Evaporation 4.50 (ton/h) 
Manufacturer KANGRIM HEAVY INDUSTRIES CO., LTD. 
*Evaporation rate: Thermal output (kW) to be filled up in case of TOH.
 
No. & Capacity of Generators (kVA) 5 AC 20,850 
Kind of Propeller Shaft 1B 
Fixed Method of Propeller Keyless 
No. & Shaft Diameter (mm) 1 x 880 
 
Shipbuilder HYUNDAI HEAVY INDUSTRIES CO., LTD. 
Hull No. 2678 
Date of Keel Lay 10 Oct 2014 
Date of Launch 27 Dec 2014 
Date of Build 05 Mar 2015 
Date of Conversion --