Classification No. 164591
IMO No. 9792008
Official No. 17741 
Signal Letters D5MM9 
Flag Liberia 
Port of Registry Monrovia 
Ship's Name SOUTHERN PUMA 
Former Name 1 --
 
Registered Owner 1 SOUTHERN DRAGON CHEMICAL S.A.
 
Management Company 1 SANSHO KOREA CO.,LTD.
 
Classification Characters, Notations NS*(TOB/CT II&III, PSPC-WBT)(ESP)(IWS)(BWTS)(IHM)
MNS* 
Descriptive Notes --
Installation Characters CHG, MPP, LSA, RCF, AFS, BWM 
Installation Descriptive Notes 
Special Description -- 
Other Classification -- 
 
Type of Ship -Purpose(intended service) OIL/CHEMICAL CARRIER 
- Certificates - SC/SE/SF Oil tanker / Chemical tanker
- OPP Oil tanker
- EE Tanker
- SMC/ISSC Oil tanker / Chemical tanker
 
Tonnage Gross (Registered) 14,965 
Tonnage Net (Registered) 8,108 
Tonnage Gross (Local) -- 
Tonnage Net (Local) -- 
Tonnage Gross (TM69) 14,965 
Tonnage Net (TM69) 8,108 
Deadweight 26,071 
 
Summer Freeboard (mm) 3,417 
Summer Draught (m) 10.613 
Lf (m) 149.070 
 
Deadweight (1)  26,071
Summer Freeboard (1) (mm)  3,417
Summer Draught (1) (m)  10.613

Deadweight (2)  19,999
Summer Freeboard (2) (mm)  5,164
Summer Draught (2) (m)  8.866
 
Continuous Max. Speed (kt)  sp;
(Sea Trial) :
15.2 
Equipment No. 2,086 
 
Overall Length (m) 156.530 
Moulded LxBxD (m) 149.000 x 25.000 x 14.000 
Registered LxBxD (m) 149.070 x 25.000 x 14.000 
 
Cargo Capacity  
(m3 / No. of Containers, etc.)
L 27,661.39 
No. of Passengers -- 
Capacity of Tanks (m3) FO 1,528.58 FW 367.89 
 
No. & Kind of Engines 1DE : 2 SA 6 CY 
Bore x Stroke (mm) 460.0 x 1,932.0 
Power (kW) 5,640 
Revolution (rpm) 110.0 
Manufacturer HITACHI ZOSEN CORPORATION INNOSHIMA WORKS 
 
No. & Kind of Boilers 1 AUX VB 
Pressure (MPa) 0.98 
Evaporation 18.42 (ton/h) 
Manufacturer MIURA Co., Ltd. 
*Evaporation rate: Thermal output (kW) to be filled up in case of TOH.
 
No. & Capacity of Generators (kVA) 4 AC 2,170 
Kind of Propeller Shaft 1A 
Fixed Method of Propeller Keyless 
No. & Shaft Diameter (mm) 1 x 450 
 
Shipbuilder ASAKAWA SHIPBUILDING CO., LTD. 
Hull No. 617 
Date of Keel Lay 28 Oct 2015 
Date of Launch 16 Sep 2016 
Date of Build 20 Dec 2016 
Date of Conversion --