Classification No. 181163
IMO No. 9826562
Official No. 49510-18 
Signal Letters H8BZ 
Flag Panama 
Port of Registry Panama 
Ship's Name SUNNY LAUREL 
Former Name 1 --
 
Registered Owner 1 ASIAN SHIPPING S.A.
2 MEIHO KAIUN CO., LTD.
 
Management Company 1 SEOYANG SHIPPING CO., LTD.
 
Classification Characters, Notations NS*(CNC, EQ C DG, PSPC-WBT, NC, 1C)(PSCM)
MNS* 
Descriptive Notes --
Installation Characters MPP, LSA, RCF, M0, AFS, BWM 
Installation Descriptive Notes 
Automatic and Remote Control Systems The ship has complied with the requirements of Chapter II-1, Part E of SOLAS, "Periodically unattended machinery spaces (UMS)".
Special Description -- 
Other Classification -- 
 
Type of Ship -Purpose(intended service) CONTAINER CARRIER 
- Certificates - SC/SE/SF Other cargo ship
- OPP Other than Oil Tanker
- EE Container ship
- SMC/ISSC Other cargo ship
 
Tonnage Gross (Registered) 9,870 
Tonnage Net (Registered) 4,663 
Tonnage Gross (Local) -- 
Tonnage Net (Local) -- 
Tonnage Gross (TM69) 9,870 
Tonnage Net (TM69) 4,663 
Deadweight 12,484 
 
Summer Freeboard (mm) 2,818 
Summer Draught (m) 8.215 
Lf (m) 129.920 
Continuous Max. Speed (kt)  sp;
(Sea Trial) :
-- 
Equipment No. 1,917 
 
Overall Length (m) 137.646 
Moulded LxBxD (m) 129.500 x 25.000 x 11.000 
Registered LxBxD (m) 129.920 x 25.000 x 11.000 
 
Cargo Capacity  
(m3 / No. of Containers, etc.)
DRY; TEU 1,000 
No. of Passengers -- 
Capacity of Tanks (m3) FO 1,163.89 FW 266.96 
 
No. & Kind of Engines 1DE : 2 SA 6 CY 
Bore x Stroke (mm) 460.0 x 1,932.0 
Power (kW) 6,700 
Revolution (rpm) 128.0 
Manufacturer MAKITA CORPORATION 
 
No. & Kind of Boilers 1 AUX VB 
Pressure (MPa) 0.80 
Evaporation 1.95 (ton/h) 
Manufacturer MIURA Co., Ltd. 
*Evaporation rate: Thermal output (kW) to be filled up in case of TOH.
 
No. & Capacity of Generators (kVA) 4 AC 3,100 
Kind of Propeller Shaft 1C 
Fixed Method of Propeller Keyless 
No. & Shaft Diameter (mm) 1 x 480 
 
Shipbuilder HAKATA SHIPBUILDING CO., LTD. 
Hull No. 805 
Date of Keel Lay 12 Nov 2015 
Date of Launch 05 Jan 2018 
Date of Build 23 Mar 2018 
Date of Conversion --