Last update : 13 Nov 2025
| Classification No. | 203457 | |
|---|---|---|
| IMO No. | 9862293 | |
| Official No. | 143824 | |
| Signal Letters | JD4793 | |
| Flag | Japan | |
| Port of Registry | Yokkaichi | |
| Ship's Name | KAGUYA | |
| Former Name 1 | -- | |
| Registered Owner 1 | Central LNG Shipping Japan Corporation | |
| Management Company 1 | NAGOYAKISEN CO., LTD | |
| Classification Characters, Notations | NS*(SWS)(HP-HDS, LGC 2G)(IWS)
MNS* |
|
| Descriptive Notes | ||
| Design Condition | Design maximum pressure: 0.31 MPa / minimum temperature: -163 degrees C | |
| Other | KA32-HD20 applied to side shell plate within Fr.32-83. | |
| Installation Characters | MPP, LSA, CAA, RCF, AFS | |
| Installation Descriptive Notes | ||
| Special Description | -- | |
| Other Classification | -- | |
| Type of Ship -Purpose(intended service) | LNG CARRIER | |
| - Certificates - SC/SE/SF | Gas carrier | |
| - OPP | Other than Oil Tanker | |
| - EE | -- | |
| - SMC/ISSC | Gas carrier | |
| Tonnage Gross (Registered) | 4,044 | |
| Tonnage Net (Registered) | -- | |
| Tonnage Gross (Local) | 4,044 | |
| Tonnage Net (Local) | -- | |
| Tonnage Gross (TM69) | -- | |
| Tonnage Net (TM69) | -- | |
| Deadweight | 2,431 | |
| Summer Freeboard (mm) | -- | |
| Summer Draught (m) | -- | |
| Lf (m) | -- | |
| Continuous Max. Speed (kt) sp; (Sea Trial) : |
-- | |
| Equipment No. | 901 | |
| Overall Length (m) | 81.700 | |
| Moulded LxBxD (m) | 76.200 x 18.000 x 7.800 | |
| Registered LxBxD (m) | 76.920 x 18.000 x 7.800 | |
|
Cargo Capacity (m3 / No. of Containers, etc.) |
L 3,539.56 | |
| No. of Passengers | -- | |
| Capacity of Tanks (m3) | FO 124.40 FW 122.80 | |
| No. & Kind of Engines | 2EM : | |
| Bore x Stroke (mm) | -- | |
| Power (kW) | 800 (400 x 2) | |
| Revolution (rpm) | 880.0 | |
| Manufacturer | TAIYO ELECTRIC CO., LTD. GIFU FACTORY | |
| No. & Kind of Boilers | 1 AUX VB | |
| Pressure (MPa) | 0.80 | |
| Evaporation | 0.50 (ton/h) | |
| Manufacturer | OSAKA BOILER MFG. CO., LTD.
*Evaporation rate: Thermal output (kW) to be filled up in case of TOH. |
|
| No. & Capacity of Generators (kVA) | 3 AC 1,800 | |
| Kind of Propeller Shaft | 1A | |
| Fixed Method of Propeller | Flange | |
| No. & Shaft Diameter (mm) | 1 x 180 | |
| Shipbuilder | Kawasaki Heavy Industries, Ltd. Ship & Offshore Structure Company Sakaide Shipyard | |
| Hull No. | 1744 | |
| Date of Keel Lay | 10 Feb 2020 | |
| Date of Launch | 27 Apr 2020 | |
| Date of Build | 30 Sep 2020 | |
| Date of Conversion | -- | |