REMARK
|
||
Classification No. : | 200848 | |
---|---|---|
IMO No. : | 9873175 | |
Official No. : | 51158-20 | |
Signal Letters : | H9VB | |
Flag : | Panama | |
Port of Registry : | Panama | |
Ship's Name : | MEDI FUJI | |
Classification Characters, Notations : | NS*(CSR, BC-A, BC-XII, GRAB 20, PSPC-WBT, NC, 1C)(ESP)(PSCM)(IHM)(SOx(EGCS))(DSS(MM, CNS, SM))
MNS* |
|
Installation Characters : | CHG, MPP, LSA, RCF, M0, AFS, BWM | |
Special Description : | -- | |
Other Classification : | -- | |
Type of Ship -Purpose(intended service) : | BULK CARRIER | |
- Certificates - SC/SE/SF : | ||
- OPP : | ||
- EE : | ||
- SMC/ISSC : | ||
Tonnage Gross (Registered) : | 43,496 | |
Tonnage Net (Registered) : | 27,558 | |
Tonnage Gross (Local) : | -- | |
Tonnage Net (Local) : | -- | |
Tonnage Gross (TM69) : | 43,496 | |
Tonnage Net (TM69) : | 27,558 | |
Deadweight : | 81,791 | |
Summer Freeboard (mm) : | 5,586 | |
Summer Draught (m) : | 14.668 | |
Lf (m) : | 225.500 | |
Continuous Max. Speed (kt) sp; (Sea Trial) : |
-- | |
Equipment No. : | 3,542 | |
Overall Length (m) : | 229.000 | |
Moulded LxBxD (m) : | 225.800 x 32.240 x 20.200 | |
Registered LxBxD (m) : | 225.500 x 32.240 x 20.200 | |
Cargo Capacity (m3 / No. of Containers, etc.) : |
G 96,597.00 | |
No. of Passengers : | -- | |
Capacity of Tanks (m3) : | FO 2,532.90 FW 650.20 | |
No. & Kind of Engines : | 1DE : 2 SA 6 CY | |
Bore x Stroke (mm) : | 600.0 x 2,400.0 | |
Power (kW) : | 8,740 | |
Revolution (rpm) : | 85.0 | |
Manufacturer : | Mitsui E&S Machinery Co., Ltd. Tamano Machinery Factory | |
No. & Kind of Boilers : | 1 AUX VB | |
Pressure (MPa) : | 0.70 | |
Evaporation : | 2.25 (ton/h) | |
Manufacturer : | OSAKA BOILER MFG. CO., LTD.
*Evaporation rate: Thermal output (kW) to be filled up in case of TOH. |
|
No. & Capacity of Generators (kVA) : | 4 AC 2,445 | |
Kind of Propeller Shaft : | 1C | |
Fixed Method of Propeller : | Keyless | |
No. & Shaft Diameter (mm) : | 1 x 530 | |
Shipbuilder : | SANOYAS SHIPBUILDING CORPORATION MIZUSHIMA SHIPYARD | |
Hull No. : | 1367 | |
Date of Keel Lay : | 22 Dec 2015 | |
Date of Launch : | 10 Dec 2019 | |
Date of Build : | 19 Feb 2020 | |
Date of Conversion : | -- | |