Classification No. 211031
IMO No. 9894741
Official No. 52138-21 
Signal Letters H3PM 
Flag Panama 
Port of Registry Panama 
Ship's Name KEN HARU 
Former Name 1 --
 
Registered Owner 1 DELICA SHIPPING S.A.
 
Management Company 1 Inui Global Logistics Co., Ltd.
 
Classification Characters, Notations NS*(BCM, BC-XII, GRAB, EQ C DG, PSPC-WBT, NC, 1C)(IWS)(IHM)(SOx(EGCS))
MNS* 
Descriptive Notes 
Design Condition Strengthened for heavy cargo loading where hold nos. 2 & 4 may be empty / Double hull construction applied to all cargo holds
Other SOx-EGCS-M/E, G/E(Nos.1, 2, 3)
Installation Characters CHG, MPP, LSA, RCF, AFS, BWM 
Installation Descriptive Notes 
Special Description -- 
Other Classification -- 
 
Type of Ship -Purpose(intended service) BULK/LUMBER CARRIER 
- Certificates - SC/SE/SF Bulk carrier (SOLAS XII Reg. 1.1)
- OPP Other than Oil Tanker
- EE Bulk carrier
- SMC/ISSC Other cargo ship
 
Tonnage Gross (Registered) 23,579 
Tonnage Net (Registered) 12,101 
Tonnage Gross (Local) -- 
Tonnage Net (Local) -- 
Tonnage Gross (TM69) 23,579 
Tonnage Net (TM69) 12,101 
Deadweight 37,555 
 
Summer Freeboard (mm) 4,500 
Summer Draught (m) 10.540 
Lf (m) 173.520 
Continuous Max. Speed (kt)  sp;
(Sea Trial) :
-- 
Equipment No. 2,648 
 
Overall Length (m) 179.970 
Moulded LxBxD (m) 173.000 x 29.800 x 15.000 
Registered LxBxD (m) 173.520 x 29.800 x 15.000 
 
Cargo Capacity  
(m3 / No. of Containers, etc.)
B 45,238.33 G 46,994.86 
No. of Passengers -- 
Capacity of Tanks (m3) FO 1,945.85 FW 294.84 
 
No. & Kind of Engines 1DE : 2 SA 6 CY 
Bore x Stroke (mm) 460.0 x 1,932.0 
Power (kW) 5,920 
Revolution (rpm) 106.0 
Manufacturer MAKITA CORPORATION 
 
No. & Kind of Boilers 1 AUX VB 
Pressure (MPa) 0.80 
Evaporation 1.70 (ton/h) 
Manufacturer MIURA Co., Ltd. 
*Evaporation rate: Thermal output (kW) to be filled up in case of TOH.
 
No. & Capacity of Generators (kVA) 4 AC 2,315 
Kind of Propeller Shaft 1C 
Fixed Method of Propeller Keyless 
No. & Shaft Diameter (mm) 1 x 450 
 
Shipbuilder SHIMANAMI SHIPYARD CO., LTD. 
Hull No. S-H745 
Date of Keel Lay 25 Dec 2015 
Date of Launch 14 Jan 2021 
Date of Build 17 Mar 2021 
Date of Conversion --