Classification No. 213649
IMO No. 9915686
Official No. 53024-22-CH 
Signal Letters 3E3345 
Flag Panama 
Port of Registry Panama 
Ship's Name OCEAN STAR 
Former Name 1 --
 
Registered Owner 1 CEBFL NO.54 (TIANJIN) SHIP LEASING CO., LIMITED
 
Management Company 1 SDSC Ship Management Co., Ltd.
 
Classification Characters, Notations NS*(PSPC-WBT, NC)(PSCM)(IHM)(NOx-III(SCR))
MNS* 
Descriptive Notes 
Design Condition Designed for carriage of refrigerated cargoes of minimum temperature: -50 degrees C
Other NOx-III(2021)(M/E : SCR), (G/E(Nos.1, 2, 3) : SCR)
Installation Characters RMC*(-50/32 for ACh), CHG, MPP, LSA, RCF, AFS, BWM 
Installation Descriptive Notes 
Special Description -- 
Other Classification -- 
 
Type of Ship -Purpose(intended service) REF. CARGO CARRIER 
- Certificates - SC/SE/SF Other cargo ship
- OPP Other than Oil Tanker
- EE Refrigerated cargo carrier
- SMC/ISSC Other cargo ship
 
Tonnage Gross (Registered) 5,566 
Tonnage Net (Registered) 1,933 
Tonnage Gross (Local) -- 
Tonnage Net (Local) -- 
Tonnage Gross (TM69) 5,566 
Tonnage Net (TM69) 1,933 
Deadweight 4,695 
 
Summer Freeboard (mm) 3,415 
Summer Draught (m) 6.814 
Lf (m) 110.460 
Continuous Max. Speed (kt)  sp;
(Sea Trial) :
-- 
Equipment No. 1,085 
 
Overall Length (m) 117.520 
Moulded LxBxD (m) 110.000 x 17.800 x 10.200 
Registered LxBxD (m) 110.460 x 17.800 x 10.200 
 
Cargo Capacity  
(m3 / No. of Containers, etc.)
B 5,040.68 REF 5,041 
No. of Passengers -- 
Capacity of Tanks (m3) FO 831.72 FW 267.87 
 
No. & Kind of Engines 1DE : 2 SA 6 CY 
Bore x Stroke (mm) 350.0 x 1,550.0 
Power (kW) 4,170 
Revolution (rpm) 167.0 
Manufacturer IMEX CO., LTD. 
 
No. & Kind of Boilers 1 AUX VB 
Pressure (MPa) 0.69 
Evaporation 2.10 (ton/h) 
Manufacturer OSAKA BOILER MFG. CO., LTD. 
*Evaporation rate: Thermal output (kW) to be filled up in case of TOH.
 
No. & Capacity of Generators (kVA) 4 AC 2,670 
Kind of Propeller Shaft 1B 
Fixed Method of Propeller Keyless 
No. & Shaft Diameter (mm) 1 x 365 
 
Shipbuilder KYOKUYO SHIPYARD CORPORATION 
Hull No. 559 
Date of Keel Lay 30 Apr 2021 
Date of Launch 01 Jul 2021 
Date of Build 30 Nov 2021 
Date of Conversion --