Last update : 7 Oct 2025
| Classification No. | 221832 | |
|---|---|---|
| IMO No. | 9943231 | |
| Official No. | 21779 | |
| Signal Letters | 5LFQ4 | |
| Flag | Liberia | |
| Port of Registry | Monrovia | |
| Ship's Name | WHITEWING | |
| Former Name 1 | -- | |
| Registered Owner 1 | HAWK MARINE CORPORATION S.A. | |
| Management Company 1 | Marine Ace Co., Ltd. | |
| Classification Characters, Notations | NS*(BCM, BC-XII, GRAB, PSPC-WBT, NC)(PS-DA&FA)(IWS)(IHM)
MNS* |
|
| Descriptive Notes | ||
| Design Condition | Strengthened for heavy cargo loading where hold nos. 2 & 4 may be empty / Double hull construction applied to all cargo holds | |
| Installation Characters | CHG, MPP, LSA, RCF, AFS, BWM | |
| Installation Descriptive Notes | ||
| Special Description | -- | |
| Other Classification | -- | |
| Type of Ship -Purpose(intended service) | BULK CARRIER | |
| - Certificates - SC/SE/SF | Bulk carrier (SOLAS XII Reg. 1.1) | |
| - OPP | Other than Oil Tanker | |
| - EE | General cargo ship | |
| - SMC/ISSC | Other cargo ship | |
| Tonnage Gross (Registered) | 23,759 | |
| Tonnage Net (Registered) | 11,966 | |
| Tonnage Gross (Local) | -- | |
| Tonnage Net (Local) | -- | |
| Tonnage Gross (TM69) | 23,759 | |
| Tonnage Net (TM69) | 11,966 | |
| Deadweight | 37,370 | |
| Summer Freeboard (mm) | 4,629 | |
| Summer Draught (m) | 10.524 | |
| Lf (m) | 174.440 | |
| Continuous Max. Speed (kt) sp; (Sea Trial) : |
-- | |
| Equipment No. | 2,680 | |
| Overall Length (m) | 179.900 | |
| Moulded LxBxD (m) | 174.000 x 30.000 x 15.100 | |
| Registered LxBxD (m) | 174.440 x 30.000 x 15.100 | |
|
Cargo Capacity (m3 / No. of Containers, etc.) |
B 46,558.60 G 47,342.20 | |
| No. of Passengers | -- | |
| Capacity of Tanks (m3) | FO 1,696.10 FW 253.20 | |
| No. & Kind of Engines | 1DE : 2 SA 6 CY | |
| Bore x Stroke (mm) | 460.0 x 1,932.0 | |
| Power (kW) | 6,330 | |
| Revolution (rpm) | 110.0 | |
| Manufacturer | MAKITA CORPORATION | |
| No. & Kind of Boilers | 1 AUX VB | |
| Pressure (MPa) | 0.69 | |
| Evaporation | 2.20 (ton/h) | |
| Manufacturer | MIURA Co., Ltd.
*Evaporation rate: Thermal output (kW) to be filled up in case of TOH. |
|
| No. & Capacity of Generators (kVA) | 4 AC 1,975 | |
| Kind of Propeller Shaft | 1B | |
| Fixed Method of Propeller | Keyless | |
| No. & Shaft Diameter (mm) | 1 x 470 | |
| Shipbuilder | SAIKI HEAVY INDUSTRIES CO., LTD. | |
| Hull No. | 697 | |
| Date of Keel Lay | 06 Oct 2015 | |
| Date of Launch | 01 Mar 2022 | |
| Date of Build | 23 Jun 2022 | |
| Date of Conversion | -- | |