Last update : 9 Apr 2026
| Classification No. | 230655 | |
|---|---|---|
| IMO No. | 9971915 | |
| Official No. | -- | |
| Signal Letters | YDC6227 | |
| Flag | Indonesia | |
| Port of Registry | Banjarmasin | |
| Ship's Name | BINA BENUA 368 | |
| Former Name 1 | -- | |
| Registered Owner 1 | PT. PELAYARAN BINABENUA SAMUDERA | |
| Management Company 1 | PT. PELAYARAN BINA BENUA SAMUDERA | |
| Classification Characters, Notations | NS*(TUG)
MNS* |
|
| Descriptive Notes | -- | |
| Installation Characters | -- | |
| Installation Descriptive Notes | ||
| Special Description | -- | |
| Other Classification | -- | |
| Type of Ship -Purpose(intended service) | TUG | |
| - Certificates - SC/SE/SF | -- | |
| - OPP | -- | |
| - EE | -- | |
| - SMC/ISSC | -- | |
| Tonnage Gross (Registered) | 243 | |
| Tonnage Net (Registered) | 73 | |
| Tonnage Gross (Local) | -- | |
| Tonnage Net (Local) | -- | |
| Tonnage Gross (TM69) | 243 | |
| Tonnage Net (TM69) | 73 | |
| Deadweight | 194.18 | |
| Summer Freeboard (mm) | 609 | |
| Summer Draught (m) | 3.012 | |
| Lf (m) | 24.290 | |
| Continuous Max. Speed (kt) sp; (Sea Trial) : |
-- | |
| Equipment No. | 140 | |
| Overall Length (m) | 26.000 | |
| Moulded LxBxD (m) | 23.934 x 8.230 x 3.600 | |
| Registered LxBxD (m) | 24.070 x 8.230 x 3.600 | |
|
Cargo Capacity (m3 / No. of Containers, etc.) |
-- | |
| No. of Passengers | -- | |
| Capacity of Tanks (m3) | FO 135.00 FW 74.46 | |
| No. & Kind of Engines | 2DE : 4 SA 6 CY | |
| Bore x Stroke (mm) | 170.0 x 180.0 | |
| Power (kW) | 1,210 (605 x 2) | |
| Revolution (rpm) | 1,800.0 | |
| Manufacturer | MITSUBISHI HEAVY INDUSTRIES, LTD. | |
| No. & Kind of Boilers | -- | |
| Pressure (MPa) | -- | |
| Evaporation | -- | |
| Manufacturer | --
*Evaporation rate: Thermal output (kW) to be filled up in case of TOH. |
|
| No. & Capacity of Generators (kVA) | 2 AC 76 | |
| Kind of Propeller Shaft | 1A | |
| Fixed Method of Propeller | Keyed, Keyed | |
| No. & Shaft Diameter (mm) | 2 x 152 | |
| Shipbuilder | TUONG AIK SHIPYARD SDN. BHD. | |
| Hull No. | TA22001 | |
| Date of Keel Lay | 30 Mar 2022 | |
| Date of Launch | 20 Sep 2022 | |
| Date of Build | 13 Jan 2023 | |
| Date of Conversion | -- | |