Classification No. 244393
IMO No. 9987392
Official No. 337523 
Signal Letters 9MVY2 
Flag Malaysia 
Port of Registry Kuching 
Ship's Name DANMAI 33 
Former Name 1 --
 
Registered Owner 1 NATAH SHIPYARD SDN. BHD.
 
Management Company 1 NATAH SHIPYARD SDN. BHD.
 
Classification Characters, Notations NS*(GSS, EQ C DG, UV)(IWS)
MNS* 
Descriptive Notes 
Purpose Multi-Purpose Vessel / Special Purpose Vessel / Oceanography research ship
Installation Characters MPP, LSA, RCF, M0, AFS 
Installation Descriptive Notes 
Automatic and Remote Control Systems The ship has complied with the requirements of Chapter II-1, Part E of SOLAS, "Periodically unattended machinery spaces (UMS)".
Special Description -- 
Other Classification -- 
 
Type of Ship -Purpose(intended service) MULTI WORK BOAT 
- Certificates - SC/SE/SF Other cargo ship
- OPP Other than Oil Tanker
- EE Ship other than ship types defined in regulation 2
- SMC/ISSC Other cargo ship
 
Tonnage Gross (Registered) 499 
Tonnage Net (Registered) 150 
Tonnage Gross (Local) -- 
Tonnage Net (Local) -- 
Tonnage Gross (TM69) 499 
Tonnage Net (TM69) 150 
Deadweight 212.86 
 
Summer Freeboard (mm) 1,210 
Summer Draught (m) 2.312 
Lf (m) 38.990 
Continuous Max. Speed (kt)  sp;
(Sea Trial) :
-- 
Equipment No. 274 
 
Overall Length (m) 41.700 
Moulded LxBxD (m) 38.806 x 11.000 x 3.500 
Registered LxBxD (m) 41.700 x 11.000 x 3.500 
 
Cargo Capacity  
(m3 / No. of Containers, etc.)
L 98.80 
No. of Passengers -- 
Capacity of Tanks (m3) FO 131.60 FW 164.30 
 
No. & Kind of Engines 2DE : 4 SA 6 CY 
Bore x Stroke (mm) 170.0 x 230.0 
Power (kW) 1,674 (837 x 2) 
Revolution (rpm) 1,450.0 
Manufacturer YANMAR POWER TECHNOLOGY CO., LTD. 
 
No. & Kind of Boilers -- 
Pressure (MPa) -- 
Evaporation -- 
Manufacturer -- 
*Evaporation rate: Thermal output (kW) to be filled up in case of TOH.
 
No. & Capacity of Generators (kVA) 4 AC 810 
Kind of Propeller Shaft 1A 
Fixed Method of Propeller Keyed, Keyed 
No. & Shaft Diameter (mm) 2 x 177 
 
Shipbuilder NATAH SHIPYARD SDN. BHD. 
Hull No. NS 207 
Date of Keel Lay 17 Jun 2023 
Date of Launch 06 Aug 2024 
Date of Build 18 Dec 2024 
Date of Conversion --