Technical Information - Text Version -

Displays the text (first approx. 2,000 characters) of ClassNK Technical Information.
For details, please click Tec No. and refer to the PDF file.

This Technical Information became null and void on 1 Dec 2016.

PSC Concentrated Inspection Campaign on Pilot Transfer Arrangement by Riyadh MoU

Tec No.: TEC- 1082 (1212kb)

Contact:

Issued:23 Aug 2016

Six (6) countries (Bahrain, Kuwait, Qatar, Saudi Arabia, Oman and UAE) of the Riyadh MoU in the Gulf Region are planning the following PSC Concentrated Inspection Campaign (CIC);

Focus of CIC: Pilot Transfer Arrangement

CIC period: From 1 September 2016 to 30 November 2016

During the campaign period, not only condition of pilot transfer arrangement, but also crew familiarization, inspection/repair records etc. will be verified in more detail as described in Press Release by Riyadh MoU (Attachment 1).

For your reference, please note that application of requirements for pilot transfer arrangement varies by installation date of pilot transfer arrangement or construction date of ship as shown in Attachment 2.

For any questions about the above, please contact:

NIPPON KAIJI KYOKAI (ClassNK)
Survey Department, Administration Center Annex, Head Office
Address: 3-3 Kioi-cho, Chiyoda-ku, Tokyo 102-0094, Japan
Tel.: +81-3-5226-2027
Fax: +81-3-5226-2029
E-mail: svd@classnk.or.jp