This Technical Information became null and void on 1 Dec 2017. PSC Concentrated Inspection Campaign on "Safety of Navigation (SOLAS CH.V)" Full-text PDF:TEC- 1121 (1084kb) Contact:Survey Department Issued:7 Aug 2017 Please be informed that Paris MoU and Tokyo MOU recently issued a Press Release announcing the launch of the following PSC joint Concentrated Inspection Campaign (CIC) in 2017. Outline of CIC Focus of CIC: Safety of Navigation (SOLAS CH.V) CIC period: From 1 September 2017 to 30 November 2017 Please refer to the attached "QUESTIONNAIRE CONCERATED INSPECTION CAMPAIGN ON SAFETY OF NAVIGATION (SOLAS CH.V) 2017" and "CIC on Safety of Navigation (SOLAS CH.V)" for details on the specific items to be targeted in CIC. Also, please note that Indian Ocean MOU and Black Sea MOU have also issued Press Releases announcing that concentrated inspection campaigns targeting the same items will be held during the same period in their respective jurisdictions.